Permit: DP19-0313
Permit Details
Apply Date:
12/24/2019
Applicant:
Ryan Wilt
Description:
TENTATIVE PLAT - La Estancia, Phase 2.Parcel 1 (Lots 1 thru 193, and common areas A-1 thru J-1) an
Permit Reviews
Permit Number - DP19-0313
Permit Status: Issued
Permit Description: TENTATIVE PLAT - La Estancia, Phase 2.Parcel 1 (Lots 1 thru 193, and common areas A-1 thru J-1) an
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/04/2021 | DEV PKG - OK TO SUBMIT | 06/10/2021 | COMPLETED |
06/10/2021 | REVISION - - 1ST | 07/13/2021 | COMPLETED |
07/06/2020 | TENTATIVE PLAT REVIEW | 08/10/2020 | COMPLETED |
08/06/2021 | REVISION - - 1ST | 09/03/2021 | COMPLETED |
08/20/2020 | TENTATIVE PLAT REVIEW | 09/22/2020 | COMPLETED |
11/22/2019 | DEV PKG - OK TO SUBMIT | 12/27/2019 | COMPLETED |
12/27/2019 | TENTATIVE PLAT REVIEW | 02/04/2020 | COMPLETED |
03/02/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 03/03/2023 | APPROVED |
01/26/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 02/23/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - DP19-0313
Permit Status: Issued
Permit Description: TENTATIVE PLAT - La Estancia, Phase 2.Parcel 1 (Lots 1 thru 193, and common areas A-1 thru J-1) an
Date | Description | Comments |
---|---|---|
07/10/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/10/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP19-0313
Permite Description: TENTATIVE PLAT - La Estancia, Phase 2.Parcel 1 (Lots 1 thru 193, and common areas A-1 thru J-1) an
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
10/18/2023 | COT - ENGR - Stormwater | N/A | Complete (Recurring) | Please clean all trash from detention area |
10/03/2023 | SITE - Stormwater Follow-up | N/A | Not Ready | All storm water ares need to be completed and cleaned of debris/trash. Inlet protection is needing to be upgraded per the SWPP plan. Common areas along Via Perfecta need to be cleaned of all weed growth. Rip rap at inlet on E Paseo Berceo needs to be on all 3 sides. Trash and weeds need to be cleaned out of storm channel along S Caminoto El Coco and along Camino Boleadoras. |
10/03/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | Very little landscaping was viewed and need plans to review. |
06/03/2024 | PDSD Site/Engineering Division - NPPO | N/A | Partial Pass | The lots on Paseo De Villalobos are not completed. |
10/03/2023 | COT - ENGR - Signage Final | N/A | Not Ready | No sign present |
Completed Inspections
Permit Status: Issued
Permit Number: DP19-0313
Permit Description: TENTATIVE PLAT - La Estancia, Phase 2.Parcel 1 (Lots 1 thru 193, and common areas A-1 thru J-1) an
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/18/2023 | SITE - SWPPP Correction Notice | Passed | ||
10/18/2023 | SITE - SWPPP Violation Notice | Passed | ||
10/18/2023 | SITE - Stormwater Setup and Controls | Passed | ||
10/18/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
11/08/2023 | ENGR Grading Final | Passed | ||
06/03/2024 | COT - ENGR - Signage Final | Passed |