Permit: DP19-0313

Parcel: 141366960


Addresses:

6601 E BENSON HY


Inspection Status: Not Ready

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP19-0313

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Follow-up Not Ready
10/03/2023 SITE - Stormwater Follow-up Not Ready All storm water ares need to be completed and cleaned of debris/trash.
Inlet protection is needing to be upgraded per the SWPP plan.
Common areas along Via Perfecta need to be cleaned of all weed growth.
Rip rap at inlet on E Paseo Berceo needs to be on all 3 sides.
Trash and weeds need to be cleaned out of storm channel along S Caminoto El Coco and along Camino Boleadoras.
10/18/2023 SITE - Stormwater Follow-up Complete (Recurring) Please call this in every 2 weeks for inspection
11/08/2023 SITE - Stormwater Follow-up Complete (Recurring) 1) concrete washouts need to
be cleaned
2) storm drain still not corected
11/16/2023 SITE - Stormwater Follow-up Not Ready