Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP19-0313
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | SITE - Stormwater Follow-up | Not Ready | ||
10/03/2023 | SITE - Stormwater Follow-up | Not Ready | All storm water ares need to be completed and cleaned of debris/trash. Inlet protection is needing to be upgraded per the SWPP plan. Common areas along Via Perfecta need to be cleaned of all weed growth. Rip rap at inlet on E Paseo Berceo needs to be on all 3 sides. Trash and weeds need to be cleaned out of storm channel along S Caminoto El Coco and along Camino Boleadoras. |
|
10/18/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Please call this in every 2 weeks for inspection | |
11/08/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | 1) concrete washouts need to be cleaned 2) storm drain still not corected |
|
11/16/2023 | SITE - Stormwater Follow-up | Not Ready |