Permit Reviews
Permit Number - DP19-0296
Permit Status: Complete
Permit Description: SITE - Live Theatre, tenant improvement.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/13/2020 | DEV PKG - RESUBMITTAL | 02/12/2020 | COMPLETED |
| 02/13/2020 | DEV PKG - RESUBMITTAL | 02/25/2020 | COMPLETED |
| 03/05/2020 | REVISION - - 1ST | 03/13/2020 | COMPLETED |
| 03/25/2020 | DEV PKG - OK TO SUBMIT | 04/27/2020 | COMPLETED |
| 04/28/2020 | REVISION - - 2ND | 04/28/2020 | COMPLETED |
| 04/29/2020 | REVISION - - 2ND | 05/01/2020 | COMPLETED |
| 07/21/2020 | DEV PKG - OK TO SUBMIT | 08/19/2020 | COMPLETED |
| 08/19/2020 | REVISION - - 3RD | 08/27/2020 | COMPLETED |
| 10/28/2019 | DEV PKG - OK TO SUBMIT | 12/03/2019 | COMPLETED |
| 12/03/2019 | DEV PKG | 01/08/2020 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0296
Permit Description: SITE - Live Theatre, tenant improvement.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2020 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 05/22/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved. Remote inspection with Susan from kittle at 256-5699. Keep materials and track out within the site. Please schedule intermediate inspections as needed when ready. Schedule building inspections for light poles. Please contact design engineer for any changes. } |
|
| 08/25/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/25/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 08/25/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 08/25/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 08/25/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 08/25/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 08/25/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 08/25/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 09/08/2020 | ENGR Engineering Final | Passed | {Activity date: 09/08/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved. All new work is within compliance. Existing 4 foot sidewalk as shown to go number four is out of compliance. } ; {Activity date: 08/25/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS NOT READY AT THIS TIME, SEE THE NOTES INTHE GRADING INTERMEDIATE.} |
|
| 09/08/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 09/08/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.} | |
| 09/08/2020 | ENGR Grading Final | Passed | {Activity date: 09/08/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 08/25/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - THE CONTRACTOR (KITTLE) IS WORKING ON THE PLACEMENT OF ABC IN THE NEW PARKING AREA. THIS AREA WILL BE COMPLETED BY THE END OF THIS WEEK, THEY WILL BE USING A STABILIZED DECOMPOSED GRANITE FOR THE STRUCTURE IN LIEU OF ASPHALT OR CONCRETE. AFTER THAT WORK IS COMPLETE THEY WILL WORK ON PATCHING UP THE EXISTING PARKING LOT, OIL SEAL, AND THEN STRIPE THE WHOLE AREA.} ; {Activity date: 06/15/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Susan with kettle construction. Revision required to change parking finish material.} ; {Activity date: 06/15/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Susan with kettle construction. Revision required to change parking finish material.} ; {Activity date: 06/05/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. RFI to relocate bicycle racks. Susan via email} ; {Activity date: 06/04/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued, irrigation} ; {Activity date: 06/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Bollards installed. Forms for continuation of accessible sidewalk. Susan with kittle} ; {Activity date: 05/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Contractor has begun trenching through existing asphalt for electrical utilities. And removed tree stuff to prepare for new walkway installation} |
|
| 09/08/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 09/08/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.} |