Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
3322 E FORT LOWELL RD
Apply Date:
11/27/2019
Applicant:
Cindy Hogan
Description:
SITE - Live Theatre, tenant improvement.

Permit Reviews

Permit Number - DP19-0296
Permit Status: Complete
Permit Description: SITE - Live Theatre, tenant improvement.
Start Date Submittal Complete Date Status  
01/13/2020 DEV PKG - RESUBMITTAL 02/12/2020 COMPLETED Review Details
02/13/2020 DEV PKG - RESUBMITTAL 02/25/2020 COMPLETED Review Details
03/05/2020 REVISION - - 1ST 03/13/2020 COMPLETED Review Details
03/25/2020 DEV PKG - OK TO SUBMIT 04/27/2020 COMPLETED Review Details
04/28/2020 REVISION - - 2ND 04/28/2020 COMPLETED Review Details
04/29/2020 REVISION - - 2ND 05/01/2020 COMPLETED Review Details
07/21/2020 DEV PKG - OK TO SUBMIT 08/19/2020 COMPLETED Review Details
08/19/2020 REVISION - - 3RD 08/27/2020 COMPLETED Review Details
10/28/2019 DEV PKG - OK TO SUBMIT 12/03/2019 COMPLETED Review Details
12/03/2019 DEV PKG 01/08/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0296
Permit Description: SITE - Live Theatre, tenant improvement.
Total Completed Inspections - 9
Date Description Inspector Results Comments
05/22/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 05/22/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved. Remote inspection with Susan from kittle at 256-5699.
Keep materials and track out within the site. Please schedule intermediate inspections as needed when ready. Schedule building inspections for light poles. Please contact design engineer for any changes.
}
08/25/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/25/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/25/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 08/25/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/25/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 08/25/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/25/2020 COT - ENGR - Signage Final Passed {Activity date: 08/25/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/08/2020 ENGR Engineering Final Passed {Activity date: 09/08/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved. All new work is within compliance. Existing 4 foot sidewalk as shown to go number four is out of compliance.

} ; {Activity date: 08/25/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS NOT READY AT THIS TIME, SEE THE NOTES INTHE GRADING INTERMEDIATE.}
09/08/2020 SITE - Stormwater Follow-up Passed {Activity date: 09/08/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.}
09/08/2020 ENGR Grading Final Passed {Activity date: 09/08/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 08/25/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - THE CONTRACTOR (KITTLE) IS WORKING ON THE PLACEMENT OF ABC IN THE NEW PARKING AREA. THIS AREA WILL BE COMPLETED BY THE END OF THIS WEEK, THEY WILL BE USING A STABILIZED DECOMPOSED GRANITE FOR THE STRUCTURE IN LIEU OF ASPHALT OR CONCRETE.
AFTER THAT WORK IS COMPLETE THEY WILL WORK ON PATCHING UP THE EXISTING PARKING LOT, OIL SEAL, AND THEN STRIPE THE WHOLE AREA.} ; {Activity date: 06/15/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Susan with kettle construction. Revision required to change parking finish material.} ; {Activity date: 06/15/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Susan with kettle construction. Revision required to change parking finish material.} ; {Activity date: 06/05/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. RFI to relocate bicycle racks. Susan via email} ; {Activity date: 06/04/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued, irrigation} ; {Activity date: 06/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Bollards installed. Forms for continuation of accessible sidewalk. Susan with kittle} ; {Activity date: 05/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Contractor has begun trenching through existing asphalt for electrical utilities. And removed tree stuff to prepare for new walkway installation}
09/08/2020 SITE - Stormwater Final Inspection Passed {Activity date: 09/08/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.}

Documents

File Name Document Type  
PAVING_ALT.PDF DOCUMENTS VIEW
REVISION_MEMO, 08.18.20.PDF DOCUMENTS VIEW
REV-2_2_REVISION_LETTER, 04.28.2020.PDF DOCUMENTS VIEW
REV-2_REVISION LETTER, 04.28.2020.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
REF_SITE (1).PDF DOCUMENTS VIEW
COMMENT-RESPONSE-LETTER, 01.13.2020.PDF DOCUMENTS VIEW
ENGINEERING_COMMENT_RESP LTR, 02.13.2020.PDF DOCUMENTS VIEW
ZONING_COMMENT_RESP LTR, 02.13.2020.PDF DOCUMENTS VIEW
REV-1_ REVISION LETTER, 03.05.2020.PDF DOCUMENTS VIEW
1-1 OF 1.PDF DEVELOPMENT PACKAGE VIEW