Permit: DP19-0296

Parcel: 11105022B

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
08/25/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
08/25/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
06/03/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Susan with Kittle Construction Installing accessible walkway
05/28/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continue. Contractor installing a light pole
09/08/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - Approved.
09/08/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - Approved.
08/25/2020 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - THE CONTRACTOR (KITTLE) IS WORKING ON THE PLACEMENT OF ABC IN THE NEW PARKING AREA. THIS AREA WILL BE COMPLETED BY THE END OF THIS WEEK, THEY WILL BE USING A STABILIZED DECOMPOSED GRANITE FOR THE STRUCTURE IN LIEU OF ASPHALT OR CONCRETE. AFTER THAT WORK IS COMPLETE THEY WILL WORK ON PATCHING UP THE EXISTING PARKING LOT, OIL SEAL, AND THEN STRIPE THE WHOLE AREA.
06/15/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Susan with kettle construction. Revision required to change parking finish material.
06/15/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Susan with kettle construction. Revision required to change parking finish material.
06/05/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. RFI to relocate bicycle racks. Susan via email
06/04/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued, irrigation
06/02/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Bollards installed. Forms for continuation of accessible sidewalk. Susan with kittle
05/22/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Contractor has begun trenching through existing asphalt for electrical utilities. And removed tree stuff to prepare for new walkway installation