Permit: DP19-0268
Permit Details
Apply Date:
10/30/2019
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP - Tucson RV Storage, new RV storage facility.
Permit Reviews
Permit Number - DP19-0268
Permit Status: Issued
Permit Description: SITE/GRADING/SWPPP - Tucson RV Storage, new RV storage facility.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/23/2020 | DEV PKG - RESUBMITTAL | 02/21/2020 | COMPLETED |
| 02/24/2020 | DEV PKG - RESUBMITTAL | 02/25/2020 | COMPLETED |
| 09/27/2019 | DEV PKG - OK TO SUBMIT | 10/31/2019 | COMPLETED |
| 10/31/2019 | DEV PKG | 12/11/2019 | COMPLETED |
Completed Inspections
Permit Status: Issued
Permit Number: DP19-0268
Permit Description: SITE/GRADING/SWPPP - Tucson RV Storage, new RV storage facility.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/28/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 12/28/2020; Status: Approved; Inspector: DROBERTSEZ; Comment: Entered by RSALDAT1 - IS APPROVED} ; {Activity date: 12/10/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THIS INSPECTION} ; {Activity date: 08/05/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 07/29/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 05/04/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time. 09185 grading intermediate. Continue. No grading activity at this time.} | |
| 04/27/2021 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 04/27/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } | |
| 04/27/2021 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 04/27/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 12/09/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Not ready. This was an unscheduled courtesy inspection for Stan with venture west at 465-9087. Schedule all required inspections from your development package permit prior to final inspection of building } |
|
| 04/27/2021 | COT - ENGR - Signage Final | Passed | {Activity date: 04/27/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } | |
| 05/27/2021 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 05/27/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } | |
| 05/27/2021 | ENGR Engineering Final | Passed | {Activity date: 05/27/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 04/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CN NEED TO GRAD ON BOTH SIDE OF SIDEWALK. NO BIKE RACK WAS NOT INSTALLED.} ; {Activity date: 12/28/2020; Status: Partial Approval; Inspector: DROBERTSEZ; Comment: Entered by RSALDAT1 - IS PARTIAL AT THIS TIME. 1) COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS OR PROVIDE US WITH APPROVED REVISED DRAWINGS FOR ALL CHANGES TO THIS SITE. A 1 STORY OFFICE STRUCTURE IS NOTED ON THE APPROVED PLANS. 2) REPAIR THE DAMAGED HANDICAP ACCESS RAMPS ON LITTLE TOWN ROAD AS NEEDED BY THE CITY OF TUCSON TRANSPORTATION DEPARTMENT. 3) REMOVE THE STOCKPILE OF MATERIAL ON THE EAST SIDE OF THIS SITE. 4) HYDROSEED ALL DISTURBED AREAS ADJACENT TO THIS SITE, ON ALL 4 SIDES.} ; {Activity date: 12/10/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - NOT READY AT THIS TIME. COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLAN, OR PROVIDE A SET OF APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE. ALSO A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD WILL BE NEEDED AS WELL AS THE NOTICE OF TERMINATION FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY. THESE CLOSE OUT DOCUMENTS CAN BE SUBMITTED ONLINE THROUGH THE SUBMITTAL PROCESS, JUST LET ME KNOW IF THAT IS DONE AND ON WHAT DATE.} ; {Activity date: 11/25/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Not ready. General contractor brought letter for trash enclosureAnd water harvesting.From engineer of record. } |
|
| 05/27/2021 | SITE - Stormwater Final Inspection | Passed | {Activity date: 05/27/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 04/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } | |
| 05/27/2021 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/27/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 04/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CN. WAITING ON A LITTER FROM THE ENGINEER OF RECORD.CITY NOT INSPECT THE STORM DRAINAGE .THE CHANNEL ON THE NORTH END NEEDS CLEAR OF OVERGROWTH.} | |
| 02/25/2022 | ENGR Grading Final | Passed | {Activity date: 02/25/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |