Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP19-0268
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2021 | ENGR Engineering Final | MHERNANDEZ | Approved | Entered by VLEON1 - |
| 04/27/2021 | ENGR Engineering Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN NEED TO GRAD ON BOTH SIDE OF SIDEWALK. NO BIKE RACK WAS NOT INSTALLED. |
| 12/28/2020 | ENGR Engineering Final | DROBERTSEZ | Partial Approval | Entered by RSALDAT1 - IS PARTIAL AT THIS TIME. 1) COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS OR PROVIDE US WITH APPROVED REVISED DRAWINGS FOR ALL CHANGES TO THIS SITE. A 1 STORY OFFICE STRUCTURE IS NOTED ON THE APPROVED PLANS. 2) REPAIR THE DAMAGED HANDICAP ACCESS RAMPS ON LITTLE TOWN ROAD AS NEEDED BY THE CITY OF TUCSON TRANSPORTATION DEPARTMENT. 3) REMOVE THE STOCKPILE OF MATERIAL ON THE EAST SIDE OF THIS SITE. 4) HYDROSEED ALL DISTURBED AREAS ADJACENT TO THIS SITE, ON ALL 4 SIDES. |
| 12/10/2020 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by PAHUMAD1 - NOT READY AT THIS TIME. COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLAN, OR PROVIDE A SET OF APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE. ALSO A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD WILL BE NEEDED AS WELL AS THE NOTICE OF TERMINATION FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY. THESE CLOSE OUT DOCUMENTS CAN BE SUBMITTED ONLINE THROUGH THE SUBMITTAL PROCESS, JUST LET ME KNOW IF THAT IS DONE AND ON WHAT DATE. |
| 11/25/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by PAHUMAD1 - Not ready. General contractor brought letter for trash enclosureAnd water harvesting.From engineer of record. |
| 12/28/2020 | ENGR Engineering Final | DROBERTSEZ | Approved | Entered by RSALDAT1 - IS APPROVED |
| 12/10/2020 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by PAHUMAD1 - PARTIAL AT THIS TIME, OK FOR A TCO. FINAL WILL NOT BE GIVEN TILL ALL OF THE WORK HAS BEEN COMPLETED AND VERIFIED BY THE INSPECTOR. |
| 05/13/2020 | ENGR Engineering Final | JV | Prior to Final Inspectn | Entered by JVWINKL1 - Substantial conformance letter required prior to close out |