Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP19-0220
Permit Details
Apply Date:
09/13/2019
Applicant:
Nathan Kappler
Description:
SITE/GRADING / IID - The Baffert at Five Points, three-story mixed use.
Permit Reviews
Permit Number - DP19-0220
Permit Status: Complete
Permit Description: SITE/GRADING / IID - The Baffert at Five Points, three-story mixed use.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/19/2020 | DEV PKG - RESUBMITTAL | 04/28/2020 | COMPLETED |
06/23/2022 | DEV PKG - OK TO SUBMIT | 07/21/2022 | COMPLETED |
07/21/2022 | DEV PKG - REVISION | 08/19/2022 | ACTIVE |
08/14/2019 | DEV PKG - OK TO SUBMIT | 09/16/2019 | COMPLETED |
08/19/2020 | DEV PKG - RESUBMITTAL | 09/21/2020 | COMPLETED |
09/16/2019 | DEV PKG | 10/29/2019 | COMPLETED |
10/07/2020 | DEV PKG - RESUBMITTAL | 10/13/2020 | COMPLETED |
10/27/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/06/2022 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP19-0220
Permite Description: SITE/GRADING / IID - The Baffert at Five Points, three-story mixed use.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/03/2021 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 06/03/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } |
05/16/2023 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | Reschedule inspection superintendent not on site |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0220
Permit Description: SITE/GRADING / IID - The Baffert at Five Points, three-story mixed use.
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/01/2023 | SITE - Stormwater Setup and Controls | Passed | ||
11/01/2023 | COT - ENGR - Signage Final | Passed | ||
11/01/2023 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
11/01/2023 | COT - FCON - Fire - Final | Passed | ||
11/01/2023 | PDSD Site/Engineering Division - NPPO | Passed | ||
11/01/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
11/01/2023 | SITE - Stormwater Final Inspection | Passed | ||
11/01/2023 | ENGR Grading Final | Passed | ||
11/01/2023 | COT - ENGR - Stormwater | Passed | ||
11/01/2023 | ENGR Engineering Final | Passed | ||
11/01/2023 | SITE - Zoning Final | Passed | ||
11/02/2023 | Verify required native plant protection, relocation, removal is completed prior to activity on job site | Passed | ||