Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
|
| 04/27/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
Contractor going to reschedule for Monday or Tuesday of next week |
| 05/03/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Complete (Recurring) |
And for the contractor needs to call him for inspection every two weeks. Gave the contractor detail plans for the trash enclosures. |
| 05/16/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Complete (Recurring) |
Reschedule inspection superintendent not on site |
| 11/01/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
|
| 11/02/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
|