Permit Reviews

Permit Number - DP19-0208
Permit Status: Complete
Permit Description: SITE/GRADING - Dutch Bros, drive-thru coffee shop.
Start Date Submittal Complete Date Status  
07/30/2019 DEV PKG - OK TO SUBMIT 08/29/2019 COMPLETED Review Details
08/29/2019 DEV PKG 10/16/2019 COMPLETED Review Details
11/14/2019 DEV PKG - RESUBMITTAL 12/02/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0208
Permit Description: SITE/GRADING - Dutch Bros, drive-thru coffee shop.
Total Completed Inspections - 9
Date Description Inspector Results Comments
05/12/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 05/12/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - }
05/12/2020 SITE - Stormwater Follow-up Passed {Activity date: 05/12/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 03/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - There is track out on Dodge that needs to be Removed.} ; {Activity date: 01/21/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Minor track out onto Dodge.}
05/12/2020 ENGR Grading Final Passed {Activity date: 05/12/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - }
05/12/2020 SITE - Stormwater Final Inspection Passed {Activity date: 05/12/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - }
05/12/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 05/12/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 03/02/2020; Status: Denied; Inspector: BBENEDON; Comment: Entered by SFLORES2 - } ; {Activity date: 01/21/2020; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There are no controls in place.}
05/12/2020 COT - ENGR - Signage Final Passed {Activity date: 05/12/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - }
05/15/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/15/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 05/13/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Remove debris from landscaped area and Install ground coverings as required. Complete all work for final approval.} ; {Activity date: 05/12/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Still working.}
05/15/2020 ENGR Engineering Final Passed {Activity date: 05/15/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 05/12/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Still working.}
05/15/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 05/15/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 03/02/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Walk the site with a new superintendent Tim. SWPPP is not required however track out protection is necessary and required. There is notable check out on Dodge Boulevard.
Call for inspection of water harvesting area prior to landscaping, and AV inspection prior to asphalt and also sign footings when ready.
Curbs have been poured. Trash enclosure footings and bollards have been installed without engineering inspection and will require Proof of inspection from building department or letter from the engineer of record certifying enclosure was built per city of Tucson standard detail 601.} ; {Activity date: 01/21/2020; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Gate is locked and there is no one on site. Project as well under construction. Trash enclosure footing has been poured without inspection.}

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
DRAINAGE_STATEMENT.PDF DOCUMENTS VIEW
GEOTECH.PDF DOCUMENTS VIEW
PRE-APP_COMMENTS.PDF DOCUMENTS VIEW
CIVIL_RESPONSE LETTER, 11.14.19.PDF DOCUMENTS VIEW
DAVID_MARHEFKA_LANDSCROW_APPROVALEMAIL.PDF DOCUMENTS VIEW
JOHN_ENCLOSURE_CLEAR_SPACE_EMAIL_ACCEPTANCE.PDF DOCUMENTS VIEW
LANDSCAPE_RESPONSE.PDF DOCUMENTS VIEW
LOT_COMBO_APPROVAL_LETTER.PDF DOCUMENTS VIEW
ZELIN_DODGE_DRIVEWAY_EMAIL_ACCEPTANCE.PDF DOCUMENTS VIEW
1-9 OF 9.PDF DEVELOPMENT PACKAGE VIEW