Permit: DP19-0195
Permit Details
Apply Date:
08/16/2019
Applicant:
Description:
**Rev 3 - Fence** - GRADING - 103 S. Panorama Circle.
Permit Reviews
Permit Number - DP19-0195
Permit Status: Issued
Permit Description: **Rev 3 - Fence** - GRADING - 103 S. Panorama Circle.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/27/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 06/30/2025 | REQUIRES RESUBMIT |
| 08/01/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 08/29/2025 | APPROVED |
| 05/09/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 06/20/2023 | APPROVED |
| 07/09/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 07/29/2025 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP19-0195
Permite Description: **Rev 3 - Fence** - GRADING - 103 S. Panorama Circle.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | SITE - Stormwater Follow-up | N/A | Not Ready | |
| 03/24/2023 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | The contractor is installing waddles on the south end of his property. Informed him to call us every two weeks for Inspections or as needed. |
| 09/22/2025 | ENGR Engineering Final | N/A | Partial Pass | Builder needs to complete all the landscape areas and a retaining wall on the north west corner of the building |
Completed Inspections
Permit Status: Issued
Permit Number: DP19-0195
Permit Description: **Rev 3 - Fence** - GRADING - 103 S. Panorama Circle.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Pre-con complete. Project is mostly complete. There is a retaining wall in revision that will need inspections for the footer, vertical reinforcement, and grout. |