Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
|
| 03/24/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Complete (Recurring) |
The contractor’s installing waddles on the south end of his property line. Informed him that he needs to call her every two weeks for inspections or as needed |
| 06/13/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Pre-con complete. Project is mostly complete. There is a retaining wall in revision that will need inspections for the footer, vertical reinforcement, and grout. |