Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
6671 E LITTLETOWN RD
Apply Date:
08/15/2019
Applicant:
Description:
SITE/GRADING/SWPPP - Arizona Auto Parts.

Permit Reviews

Permit Number - DP19-0192
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Arizona Auto Parts.
Start Date Submittal Complete Date Status  
01/14/2021 REVISION - - 1ST 05/26/2021 COMPLETED Review Details
05/26/2021 DEV PKG - OK TO SUBMIT 06/03/2021 COMPLETED Review Details
06/03/2021 REVISION - - 2ND 06/18/2021 COMPLETED Review Details
06/22/2021 REVISION - - 2ND 08/02/2021 COMPLETED Review Details
07/12/2019 DEV PKG - OK TO SUBMIT 08/16/2019 COMPLETED Review Details
08/16/2019 DEV PKG 10/23/2019 COMPLETED Review Details
11/12/2019 DEV PKG - RESUBMITTAL 12/16/2019 COMPLETED Review Details
12/17/2019 DEV PKG - RESUBMITTAL 08/05/2020 COMPLETED Review Details
12/17/2020 DEV PKG - OK TO SUBMIT 01/14/2021 COMPLETED Review Details

Conditions

Permit Number - DP19-0192
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Arizona Auto Parts.
Date Description Comments
12/17/2019 LANDSCAPE ACTION REQUIRED BEFORE FINAL INSPECTION CAN BE APPROVED. Provide recorded document(s) in a surveyable manner for conservation easement.

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0192
Permit Description: SITE/GRADING/SWPPP - Arizona Auto Parts.
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/15/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/15/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/15/2021 SITE - Stormwater Setup and Controls Passed {Activity date: 07/15/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/15/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/15/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/15/2021 COT - ENGR - Signage Final Passed {Activity date: 07/15/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/26/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/26/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/26/2021 ENGR Engineering Final Passed {Activity date: 08/26/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/26/2021 SITE - Stormwater Follow-up Passed {Activity date: 08/26/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/26/2021 ENGR Grading Final Passed {Activity date: 08/26/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/08/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED AT THIS TIME. THE CONTRACTOR HAS COMPLETED MOST OF THE PREVIOUS ISSUES THAT I HAD ADDRESSED DURING OUR LAST SITE VISIT. THERE ARE SOME REMAINING ITEMS LEFT TO BE COMPLETED, BUT SOME OF THE ITEMS THE ENGINEER OF RECORD IS WORKING ON REMOVING FROM THE APPROVED. DEPENDING ON HIS SUCCESS WILL DETERMINE WHAT WILL BE NEEDED IN THE FUTURE. THIS SITE WILL BE READY FOR A TCO ONCE THE BUILDING INSPECTOR GIVES HIS APPROVAL FOR THIS SITE. THE FINAL FOR THE SITE WILL NOT BE READY FOR A FINAL INSPECTION FOR A FEW MONTHS, PENDING THE APPROVAL OF THE REVISED DRAWINGS FOR THIS SITE.

} ; {Activity date: 02/11/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED AT THIS TIME. I WALKED THE SITE WITH NATE THE FUTURE SITE MANAGER AND DISCUSSED WHAT WILL NEED TO HAPPEN PRIOR TO THEM CLOSING THE PROJECT. CURRENTLY THEY HAVE AN AREA WHERE THEY WERE TO PLACE COMPACTED PAVEMENT IN LOCATED AT THE SOUTHEAST CORN OF THE SITE. ALSO THERE ARE AREAS OF MISSING SIDEWALK ON THE SOUTH AN NORTHS SIDE OF THIS SITE AS WELL AS MISSING PARKING SPACES ON THE NORTH, EAST, AND SOUTH SIDES OF THE BUILDING. ALL AREAS THA WERE SHOWN TO BE DELINQUENT AT THIS TIME EITHER NEED TO BE COMPLETER PER THE APPROVED PLAN, OR THEY WILL NEED TO PROVIDE ME APPROVED REVISED DRAWINGS NOTING ALL OF THE CHANGES. THIS INSPECTION WILL BE RESCHEDULED NEXT WEEK TO LOOK AT THE LANDSCAPE PLANS FOR THE SITE, NO PLANS AVAILABLE AT THIS TIME.} ; {Activity date: 02/08/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED AT THIS TIME. THE CONTRACTOR HAS COMPLETED ALL OF THE PARKING LOT GRADING AND PAVING AT THIS TIME. THE LANDSCAPING WORK HAS BEEN DONE ON 75% OF THE SITE AND NONE OF THIS WORK HAS BEEN INSPECTED. MINOR CHANGES HAVE BEEN MADE TO THIS SITE THAT NEED TO BE REFLECTED WITH THE REVISED DRAWINGS. I HAVE DIRECTED THE CONTRACTOR TO CALL IN AT LEAST ONE INSPECTION BEFORE THE END OF THIS WEEK SO THAT WE CAN START TO PREPARE A LIST OF ITEMS THAT NEED TO BE CORRECTED. WE WALKED PORTIONS OF THIS SITE TODAY TO LOOK AT THE TREE STAKING, HANDICAP PARKING AND SIGNAGE, BICYCLE PARKING, AND THE BICYCLE PARKING(LONG TERM & SHORT TERM). I HAVE ADVISED THEM OF AREAS OF CONCERN BY ME AT THIS TIME, I ADVISED THEM TO CONTACT MR.KENNETH PERRY THE ENGINEER OF RECORD ABOUT THE CONCERNS THAT I HAVE RAISED DURING THIS SITE VISIT.}
08/26/2021 SITE - Stormwater Final Inspection Passed {Activity date: 08/26/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
ONLINE SUBMITTAL PAGE, RECVD 06.17.21.PDF DOCUMENTS VIEW
CHANGES LETTER 6.17.21.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 05.20.21.PDF DOCUMENTS VIEW
CHANGES LETTER, REVISION.PDF DOCUMENTS VIEW
DRAINAGE LETTER PACKAGE.PDF DOCUMENTS VIEW
REVISION LETTER, 12.17.20.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, 12.17.20.PDF DOCUMENTS VIEW
LETTER OF INTENT AND PIMA CO DEQ.PDF DOCUMENTS VIEW
1-57 OF 57.PDF DEVELOPMENT PACKAGE VIEW
TRANSMITTAL SHEET.PDF DOCUMENTS VIEW
APPLICATION AND LOCATION MAP.PDF DOCUMENTS VIEW
TITLE REPORT 07.24.19.PDF DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW
TEP FACILITIES MAP, 10.23.19.PDF DOCUMENTS VIEW
TRANSMITTAL SHEET.PDF DOCUMENTS VIEW
DRAINAGE REPORT 11-12-2019.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER 11-12-2019.PDF DOCUMENTS VIEW
MEMO RE COMPLIANCE WITH SPECIAL USE EXCEPTIONS.PDF DOCUMENTS VIEW
LANDSCAPE COMMENT RESPONSE LETTER 11-12-2019.PDF DOCUMENTS VIEW
TRANSMITTAL SHEET.PDF DOCUMENTS VIEW
COMMENT RESPONSE LTR-CIVIL, 12.17.19.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER - LANDSCAPE.PDF DOCUMENTS VIEW
NUOS_EASEMENT_SEQ - 20200730193.PDF DOCUMENTS VIEW