Permit: DP19-0114
Permit Details
Apply Date:
05/03/2019
Applicant:
Description:
GRADING - Banner Health Business Campus, on-site private drainage improvements, existing office buil
Permit Reviews
Permit Number - DP19-0114
Permit Status: Complete
Permit Description: GRADING - Banner Health Business Campus, on-site private drainage improvements, existing office buil
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/05/2019 | DEV PKG - OK TO SUBMIT | 05/10/2019 | COMPLETED |
| 05/10/2019 | DEV PKG | 06/11/2019 | COMPLETED |
| 06/13/2019 | DEV PKG - RESUBMITTAL | 07/01/2019 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0114
Permit Description: GRADING - Banner Health Business Campus, on-site private drainage improvements, existing office buil
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 10/04/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/03/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Valencia Road is shut down by the police there was no access to the job site. I called Jeff and let him know that I would reschedule the inspection for tomorrow. Jeff at 282-2357.} | |
| 10/04/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 10/04/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/03/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Valencia Road is shut down by the police there was no access to the job site. I called Jeff and let him know that I would reschedule the inspection for tomorrow. Jeff at 282-2357.} | |
| 10/04/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 10/04/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/03/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Valencia Road is shut down by the police there was no access to the job site. I called Jeff and let him know that I would reschedule the inspection for tomorrow. Jeff at 282-2357.} | |
| 10/04/2019 | ENGR Grading Final | Passed | {Activity date: 10/04/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/03/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Valencia Road is shut down by the police there was no access to the job site. I called Jeff and let him know that I would reschedule the inspection for tomorrow. Jeff at 282-2357.} | |
| 10/04/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 10/04/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/03/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Valencia Road is shut down by the police there was no access to the job site. I called Jeff and let him know that I would reschedule the inspection for tomorrow. Jeff at 282-2357.} | |
| 10/04/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 10/04/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/03/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Valencia Road is shut down by the police there was no access to the job site. I called Jeff and let him know that I would reschedule the inspection for tomorrow. Jeff at 282-2357.} | |
| 10/04/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 10/04/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/03/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Valencia Road is shut down by the police there was no access to the job site. I called Jeff and let him know that I would reschedule the inspection for tomorrow. Jeff at 282-2357.} | |
| 10/04/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 10/04/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/03/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Valencia Road is shut down by the police there was no access to the job site. I called Jeff and let him know that I would reschedule the inspection for tomorrow. Jeff at 282-2357.} | |
| 11/01/2019 | ENGR Engineering Final | Passed | {Activity date: 11/01/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/04/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Grout or repair the opening between the concrete and the building below the pipes. Complete the work shown on the plan and provide riprap and stabilization to all disturbed dirt and areas between stormwater outlets and drainage structure. Provide a plan revision for the change of the piping installed below the building.} ; {Activity date: 10/03/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Valencia Road is shut down by the police there was no access to the job site. I called Jeff and let him know that I would reschedule the inspection for tomorrow. Jeff at 282-2357.} |