Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/01/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/04/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Grout or repair the opening between the concrete and the building below the pipes. Complete the work shown on the plan and provide riprap and stabilization to all disturbed dirt and areas between stormwater outlets and drainage structure. Provide a plan revision for the change of the piping installed below the building. |
| 10/03/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Valencia Road is shut down by the police there was no access to the job site. I called Jeff and let him know that I would reschedule the inspection for tomorrow. Jeff at 282-2357. |
| 11/01/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/04/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Grout or repair the opening between the concrete and the building below the pipes. Complete the work shown on the plan and provide riprap and stabilization to all disturbed dirt and areas between stormwater outlets and drainage structure. Provide a plan revision for the change of the piping installed below the building. |
| 10/03/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Valencia Road is shut down by the police there was no access to the job site. I called Jeff and let him know that I would reschedule the inspection for tomorrow. Jeff at 282-2357. |