Permit: DP19-0108
Permit Details
Apply Date:
04/30/2019
Applicant:
Anthony Capps
Description:
SITE - Burger King, new storage addition to existing restaurant.
Permit Reviews
Permit Number - DP19-0108
Permit Status: Complete
Permit Description: SITE - Burger King, new storage addition to existing restaurant.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/02/2019 | DEV PKG - OK TO SUBMIT | 05/10/2019 | COMPLETED |
| 05/07/2019 | DEV PKG | 05/21/2019 | COMPLETED |
| 05/21/2019 | DEV PKG - RESUBMITTAL | 06/04/2019 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0108
Permit Description: SITE - Burger King, new storage addition to existing restaurant.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/25/2021 | ENGR Engineering Final | Passed | {Activity date: 05/25/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - APPROVED NEW STORAGE ADDITION TO RESTAURANT} ; {Activity date: 05/04/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 12/13/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Please provide a bicycle parking as previously noted.} ; {Activity date: 08/14/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Provide bicycle parking shown on city approved plans. Engineering has no issues preventing store from re-opening. All accessible parking and routes are shown as existing.} ; {Activity date: 07/25/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - THIS IS NOT THE CORRECT INSPECTION. INSPECTION 91 GRADING REBAR IS NOT READY AT THIS TIME, ADDITIONAL BLOCKS ARE REQUIRED IN THE MAT AREA TO SUPPORT THE REBAR MAT. CLEAR ALL EXCESS DIRT FROM AROUND THE BOLLARDS PRIOR TO CONCRETE PLACEMENT. PHOTOGRAPHS OF THE COMPLETED IS ACCEPTABLE IN LIEU OF AN ADDITIONAL INSPECTION. CONTACT DAVID ROBERTS AT 349-7643 FOR FURTHER INSTRUCTIONS.} ; {Activity date: 07/16/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - General contractor asking for advice matching new accessible route into existing. I requested the area in front of the new door to be in compliance, and let him know that I would allowHim to feather in the new portion to the existing, but I did suggest that he RFI his engineer and install the new work in accordance with the engineers direction} ; {Activity date: 07/09/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - This inspection is for pre grout at the trashing closure and stormwater. Pre-grout OK two single trash enclosures. No Stormwater issues at this time.} ; {Activity date: 06/21/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor has the permit card with all of the required inspections however he was not able to schedule the appropriate inspection code, and was told by the permit counter to simply use engineering final for all of the inspections.Note this is a complete building remodel. However accessible parking and walkways are shown on the plan to be existing. Trash enclosure footing is it OK for concrete. No issues concerning stormwater inspections.} |