Date Description Inspector Results Comments
05/25/2021 ENGR Engineering Final MHERNANDEZ Approved Entered by VLEON1 - APPROVED NEW STORAGE ADDITION TO RESTAURANT
05/04/2021 ENGR Engineering Final MHERNANDEZ Continued Entered by VLEON1 -
12/13/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Please provide a bicycle parking as previously noted.
08/14/2019 ENGR Engineering Final BBENEDON Partial Approval Entered by DMERANZ1 - Provide bicycle parking shown on city approved plans. Engineering has no issues preventing store from re-opening. All accessible parking and routes are shown as existing.
07/25/2019 ENGR Engineering Final DROBERTS Continued Entered by DMERANZ1 - THIS IS NOT THE CORRECT INSPECTION. INSPECTION 91 GRADING REBAR IS NOT READY AT THIS TIME, ADDITIONAL BLOCKS ARE REQUIRED IN THE MAT AREA TO SUPPORT THE REBAR MAT. CLEAR ALL EXCESS DIRT FROM AROUND THE BOLLARDS PRIOR TO CONCRETE PLACEMENT. PHOTOGRAPHS OF THE COMPLETED IS ACCEPTABLE IN LIEU OF AN ADDITIONAL INSPECTION. CONTACT DAVID ROBERTS AT 349-7643 FOR FURTHER INSTRUCTIONS.
07/16/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - General contractor asking for advice matching new accessible route into existing. I requested the area in front of the new door to be in compliance, and let him know that I would allowHim to feather in the new portion to the existing, but I did suggest that he RFI his engineer and install the new work in accordance with the engineers direction
07/09/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - This inspection is for pre grout at the trashing closure and stormwater. Pre-grout OK two single trash enclosures. No Stormwater issues at this time.
06/21/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Contractor has the permit card with all of the required inspections however he was not able to schedule the appropriate inspection code, and was told by the permit counter to simply use engineering final for all of the inspections.Note this is a complete building remodel. However accessible parking and walkways are shown on the plan to be existing. Trash enclosure footing is it OK for concrete. No issues concerning stormwater inspections.