Permit Details

Status:
Complete
Type:
Development Package
Address:
3300 S PARK AV
Apply Date:
04/16/2019
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP - JTED at the Bridges. Elementary and secondary (charter school).

Permit Reviews

Permit Number - DP19-0093
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - JTED at the Bridges. Elementary and secondary (charter school).
Start Date Submittal Complete Date Status  
03/25/2019 DEV PKG - OK TO SUBMIT 04/23/2019 COMPLETED Review Details
04/23/2019 DEV PKG 05/30/2019 COMPLETED Review Details
05/21/2019 DEV PKG - RESUBMITTAL 06/14/2019 COMPLETED Review Details
06/17/2019 DEV PKG - RESUBMITTAL 06/28/2019 COMPLETED Review Details
07/30/2019 DEV PKG - RESUBMITTAL 08/02/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP19-0093
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - JTED at the Bridges. Elementary and secondary (charter school).
Total Outstanding Activity Conditions - 1
Date Name
08/02/2019 For C of O, provide copy of the Zoning Administrator approved charter school letter.

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0093
Permit Description: SITE/GRADING/SWPPP - JTED at the Bridges. Elementary and secondary (charter school).
Total Completed Inspections - 9
Date Description Inspector Results Comments
09/23/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - }
09/23/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Dan with BFL, 208-691-9545. Cypress engineering. Charter school.}
09/04/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 09/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.}
09/04/2020 COT - ENGR - Signage Final Passed {Activity date: 09/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.}
09/09/2020 SITE - Stormwater Follow-up Passed {Activity date: 09/09/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 05/04/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - No issues at this time.} ; {Activity date: 01/17/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Required controls are in place.} ; {Activity date: 11/13/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time. Walk the site with Dan from BFL} ; {Activity date: 11/05/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There are no issues. This site is contained within another job site and SWPPP.}
09/18/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/18/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 08/20/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Landscaping at Eastern edge of parking area and around building}
09/18/2020 ENGR Engineering Final Passed {Activity date: 09/18/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 08/04/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Engineering has no issues that would prevent a temporary certificate of occupancy. At this time corrections are required for accessible parking spaces. Contractors will ensure proper separation from the public when performing this correction. Contact Dan with Bfl construction.}
09/18/2020 SITE - Stormwater Final Inspection Passed {Activity date: 09/18/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 09/10/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Not ready. Provide notice of termination of SWPPP} ; {Activity date: 09/10/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Provide notice of termination of SWPPP}
03/18/2021 ENGR Grading Final Passed {Activity date: 03/18/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/06/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS PARTIAL AT THIS TIME, OK FOR TCO AT THIS TIME} ; {Activity date: 08/05/2020; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 08/03/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Correct grade at parking Islands for water harvesting.} ; {Activity date: 07/31/2020; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 07/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Paving and curbs have been installed. No landscaping at this time. Utility work at north east corner.} ; {Activity date: 06/08/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Paving. Dan w/ BFL} ; {Activity date: 06/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 05/21/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Remote inspection with Dan. Contractor installing final grade and curbs as shown.

} ; {Activity date: 05/06/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. 12 inch bleeder pipe on Westbank of basin as shown. Remote inspection with Dan from BFL} ; {Activity date: 05/04/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Contractor preparing for final grade, installing overflow pipe at basin and perimeter fencing. Dan with Bfl
} ; {Activity date: 03/26/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Contractor is installing curbs along exterior portion east. And sidewalks near building. Dan Bishop with BFL At 208 Dash 691–9545

} ; {Activity date: 12/05/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues or concerns at this time.} ; {Activity date: 11/05/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Builder is preparing for building slab.
} ; {Activity date: 11/04/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor on his way offsite at 2:30 PM, requested inspection for the following day.}

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
FINAL_REPORT_C9-06-32.PDF DOCUMENTS VIEW
GEOTECH.PDF DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW
PIMACO ADDRESSING REVIEW, 05.14.19.PDF DOCUMENTS VIEW
ACCESS_EASEMENT.PDF DOCUMENTS VIEW
COMMENT_RESPONSE.PDF DOCUMENTS VIEW
DRAINAGE_STATEMENT.PDF DOCUMENTS VIEW
EMAIL_NO_ZONING_CLEARANCE_NEEDED.PDF DOCUMENTS VIEW
TEP FACILITIES MAP, 05.30.19.PDF DOCUMENTS VIEW
COMMENT_RESPONSE, 06.17.19.PDF DOCUMENTS VIEW
FINAL_TRAFFIC_MEMO.PDF DOCUMENTS VIEW
CIVIL_RESPONSE LTR, 07.29.19.PDF DOCUMENTS VIEW
TRAFFIC_LETTER, 07.29.19.PDF DOCUMENTS VIEW
1-8 OF 8.PDF DEVELOPMENT PACKAGE VIEW