Permit: DP19-0093
Permit Details
Apply Date:
04/16/2019
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP - JTED at the Bridges. Elementary and secondary (charter school).
Permit Reviews
Permit Number - DP19-0093
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - JTED at the Bridges. Elementary and secondary (charter school).
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/25/2019 | DEV PKG - OK TO SUBMIT | 04/23/2019 | COMPLETED |
04/23/2019 | DEV PKG | 05/30/2019 | COMPLETED |
05/21/2019 | DEV PKG - RESUBMITTAL | 06/14/2019 | COMPLETED |
06/17/2019 | DEV PKG - RESUBMITTAL | 06/28/2019 | COMPLETED |
07/30/2019 | DEV PKG - RESUBMITTAL | 08/02/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP19-0093
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - JTED at the Bridges. Elementary and secondary (charter school).
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
08/02/2019 | For C of O, provide copy of the Zoning Administrator approved charter school letter. |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0093
Permit Description: SITE/GRADING/SWPPP - JTED at the Bridges. Elementary and secondary (charter school).
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/23/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } | |
09/23/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Dan with BFL, 208-691-9545. Cypress engineering. Charter school.} | |
09/04/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 09/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.} | |
09/04/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 09/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.} | |
09/09/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 09/09/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 05/04/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - No issues at this time.} ; {Activity date: 01/17/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Required controls are in place.} ; {Activity date: 11/13/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time. Walk the site with Dan from BFL} ; {Activity date: 11/05/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There are no issues. This site is contained within another job site and SWPPP.} | |
09/18/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 09/18/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 08/20/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Landscaping at Eastern edge of parking area and around building} | |
09/18/2020 | ENGR Engineering Final | Passed | {Activity date: 09/18/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 08/04/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Engineering has no issues that would prevent a temporary certificate of occupancy. At this time corrections are required for accessible parking spaces. Contractors will ensure proper separation from the public when performing this correction. Contact Dan with Bfl construction.} | |
09/18/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 09/18/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 09/10/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Not ready. Provide notice of termination of SWPPP} ; {Activity date: 09/10/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Provide notice of termination of SWPPP} | |
03/18/2021 | ENGR Grading Final | Passed | {Activity date: 03/18/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/06/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS PARTIAL AT THIS TIME, OK FOR TCO AT THIS TIME} ; {Activity date: 08/05/2020; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 08/03/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Correct grade at parking Islands for water harvesting.} ; {Activity date: 07/31/2020; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 07/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Paving and curbs have been installed. No landscaping at this time. Utility work at north east corner.} ; {Activity date: 06/08/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Paving. Dan w/ BFL} ; {Activity date: 06/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 05/21/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Remote inspection with Dan. Contractor installing final grade and curbs as shown. } ; {Activity date: 05/06/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. 12 inch bleeder pipe on Westbank of basin as shown. Remote inspection with Dan from BFL} ; {Activity date: 05/04/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Contractor preparing for final grade, installing overflow pipe at basin and perimeter fencing. Dan with Bfl } ; {Activity date: 03/26/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Contractor is installing curbs along exterior portion east. And sidewalks near building. Dan Bishop with BFL At 208 Dash 691–9545 } ; {Activity date: 12/05/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues or concerns at this time.} ; {Activity date: 11/05/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Builder is preparing for building slab. } ; {Activity date: 11/04/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor on his way offsite at 2:30 PM, requested inspection for the following day.} |