Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP19-0093
Inspection Description - ENGR Grading Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 07/23/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Discussion with Dan from Bfl about access requirements for completion of permit. Project estimated completion September |
| 09/23/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by VFLORES1 - BFL construction, has started construction, basin has been cut, Temporary fence has been installed. |
| 03/18/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 08/06/2020 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by RSALDAT1 - IS PARTIAL AT THIS TIME, OK FOR TCO AT THIS TIME |
| 08/05/2020 | ENGR Grading Final | IVR USER | Cancelled | Entered by IVR USER - IVRS - AP canceled |
| 08/03/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Correct grade at parking Islands for water harvesting. |
| 07/31/2020 | ENGR Grading Final | IVR USER | Cancelled | Entered by IVR USER - IVRS - AP canceled |
| 07/02/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by JSCHNEI2 - Continued. Paving and curbs have been installed. No landscaping at this time. Utility work at north east corner. |
| 06/08/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Paving. Dan w/ BFL |
| 06/04/2020 | ENGR Grading Final | BBENEDON | Approved | Entered by RSALDAT1 - |
| 05/21/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Remote inspection with Dan. Contractor installing final grade and curbs as shown. |
| 05/06/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. 12 inch bleeder pipe on Westbank of basin as shown. Remote inspection with Dan from BFL |
| 05/04/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Contractor preparing for final grade, installing overflow pipe at basin and perimeter fencing. Dan with Bfl |
| 03/26/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by SFLORES2 - Contractor is installing curbs along exterior portion east. And sidewalks near building. Dan Bishop with BFL At 208 Dash 691-9545 |
| 12/05/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - No issues or concerns at this time. |
| 11/05/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Builder is preparing for building slab. |
| 11/04/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Contractor on his way offsite at 2:30 PM, requested inspection for the following day. |
| 08/04/2020 | ENGR Grading Final | BBENEDON | Approved | Entered by RSALDAT1 - . Approved |
| 02/18/2020 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DMERANZ1 - COMPLETE THE TOP ROW OF BLOCK PREPARING THEM FOR THE BOND BEAM AND PROVIDE PHOTOGRAPHS PRIOR TO PLACING GROUT. |
| 01/28/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Block walls to 4 feet. |
| 01/09/2020 | ENGR Grading Final | DROBERTS | Not ready for Inspection | Entered by DMERANZ1 - I WILL REINSPECT AT THE END OF THE DAY.Remove the extra dirt around the bollards and provide photos showing the dirt has been removed OK to pour at this time |
| 09/14/2020 | ENGR Grading Final | BBENEDON | Approved | Entered by RSALDAT1 - Approved |