Permit: DP19-0045
Permit Details
Apply Date:
02/20/2019
Applicant:
Kyle Shepherd
Description:
GRADING/SWPPP - La Estancia de Tucson, Block 26, Lots 1-47, Common areas "A" and "B".
Permit Reviews
Permit Number - DP19-0045
Permit Status: Issued
Permit Description: GRADING/SWPPP - La Estancia de Tucson, Block 26, Lots 1-47, Common areas "A" and "B".
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/17/2019 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 02/20/2019 | COMPLETED |
02/21/2019 | GRADING | 04/03/2019 | COMPLETED |
04/16/2019 | DEV PKG - RESUBMITTAL | 05/08/2019 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP19-0045
Permite Description: GRADING/SWPPP - La Estancia de Tucson, Block 26, Lots 1-47, Common areas "A" and "B".
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/09/2022 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | |
02/10/2023 | ENGR Grading Final | N/A | Partial Pass |
Completed Inspections
Permit Status: Issued
Permit Number: DP19-0045
Permit Description: GRADING/SWPPP - La Estancia de Tucson, Block 26, Lots 1-47, Common areas "A" and "B".
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/09/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/09/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Had meeting at earlier date.} ; {Activity date: 07/12/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } | |
09/20/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 09/20/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by VFLORES1 - } ; {Activity date: 08/09/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Controls that have been installed need to be repaired at this time.} ; {Activity date: 07/12/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Stormwater controls need to be added to west side of site.} | |
05/29/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 05/29/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - } | |
05/05/2022 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 05/05/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - APPROVED 6995 E CAMINO BOLEADORAS} ; {Activity date: 05/05/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - APPROVED 7600 S KOLB RD} |
|
01/20/2023 | SITE - Stormwater Final Inspection | Passed | N/A | |
01/20/2023 | ENGR Engineering Final | Passed | N/A | |
01/20/2023 | SITE - Stormwater Follow-up | Passed | N/A | |
01/20/2023 | PDSD Site/Engineering Division - Landscaping | Passed | N/A | |
05/01/2023 | ENGR Grading Final | Passed | All work for this site has been completed as shown on the approved plans. The landscaping on the north side of this project has not been completed or verified with an approval center drawings. There are random flags located along the bike path that indicate that additional plants were to be installed on the original plan DP17-0037. This portion of the site will be Inspected using the original plans noted above or plans utilized for the Bike Path Construction. |