Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Apply Date:
02/20/2019
Applicant:
David Little
Description:
GRADING/SWPPP - La Estancia de Tucson, Block 26, Lots 1-47, Common areas "A" and "B".

Permit Reviews

Permit Number - DP19-0045
Permit Status: Issued
Permit Description: GRADING/SWPPP - La Estancia de Tucson, Block 26, Lots 1-47, Common areas "A" and "B".
Start Date Submittal Complete Date Status  
01/17/2019 DEV PKG - OK TO SUBMIT (GRADING ONLY) 02/20/2019 COMPLETED Review Details
02/21/2019 GRADING 04/03/2019 COMPLETED Review Details
04/16/2019 DEV PKG - RESUBMITTAL 05/08/2019 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP19-0045
Permite Description: GRADING/SWPPP - La Estancia de Tucson, Block 26, Lots 1-47, Common areas "A" and "B".
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/09/2022 SITE - Stormwater Follow-up N/A Complete (Recurring)
02/10/2023 ENGR Grading Final N/A Partial Pass

Completed Inspections

Permit Status: Issued
Permit Number: DP19-0045
Permit Description: GRADING/SWPPP - La Estancia de Tucson, Block 26, Lots 1-47, Common areas "A" and "B".
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/09/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/09/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Had meeting at earlier date.} ; {Activity date: 07/12/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
09/20/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 09/20/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by VFLORES1 - } ; {Activity date: 08/09/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Controls that have been installed need to be repaired at this time.} ; {Activity date: 07/12/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Stormwater controls need to be added to west side of site.}
05/29/2020 COT - ENGR - Signage Final Passed {Activity date: 05/29/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
05/05/2022 PDSD Site/Engineering Division - NPPO Passed {Activity date: 05/05/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - APPROVED
6995 E CAMINO BOLEADORAS} ; {Activity date: 05/05/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - APPROVED
7600 S KOLB RD}
01/20/2023 SITE - Stormwater Final Inspection Passed N/A
01/20/2023 ENGR Engineering Final Passed N/A
01/20/2023 SITE - Stormwater Follow-up Passed N/A
01/20/2023 PDSD Site/Engineering Division - Landscaping Passed N/A
05/01/2023 ENGR Grading Final Passed All work for this site has been completed as shown on the approved plans. The landscaping on the north side of this project has not been completed or verified with an approval center drawings. There are random flags located along the bike path that indicate that additional plants were to be installed on the original plan DP17-0037. This portion of the site will be Inspected using the original plans noted above or plans utilized for the Bike Path Construction.

Documents

File Name Document Type  
PERMIT-SIGNED.PDF DOCUMENTS VIEW
CONTRACTORS LETTER OF INTENT.PDF DOCUMENTS VIEW
APPLICATION - SIGNED.PDF DOCUMENTS VIEW
SOILS REPORT EVANOFF.PDF DOCUMENTS VIEW
SWPPP EROSION BLOCK 26.PDF DOCUMENTS VIEW
COMMENT RESP LTR, 04.16.19.PDF DOCUMENTS VIEW
1-5 OF 5.PDF DEVELOPMENT PACKAGE VIEW