Permit: DP19-0009
Permit Details
Apply Date:
01/17/2019
Applicant:
Earl Yousey
Description:
SITE - Southgate Academy (Site Revision-1), revised grading and walkways.
Permit Reviews
Permit Number - DP19-0009
Permit Status: Complete
Permit Description: SITE - Southgate Academy (Site Revision-1), revised grading and walkways.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/18/2019 | DEV PKG | 02/19/2019 | COMPLETED |
03/25/2019 | DEV PKG - RESUBMITTAL | 03/26/2019 | COMPLETED |
12/12/2018 | DEV PKG - OK TO SUBMIT | 01/18/2019 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP19-0009
Permite Description: SITE - Southgate Academy (Site Revision-1), revised grading and walkways.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/14/2020 | ENGR Grading Final | N/A | Complete (Recurring) | {Activity date: 01/14/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - This was an unscheduled inspection for Dave Roberts. 850 W. Valencia is Southgate Academy. It Appears that the majority of the work has been completed with the exception of the water harvesting basin.The school is occupied. Inspector will need more than the allotted 10 minutes to complete a thorough inspection of the site including drive time.} |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0009
Permit Description: SITE - Southgate Academy (Site Revision-1), revised grading and walkways.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/09/2019 | ENGR Engineering Final | Passed | {Activity date: 05/09/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/03/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Re-calling for inspection on Tuesday.} ; {Activity date: 04/12/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by CBELL1 - The contractor needs to pour a new sidewalk from the school to Santa Clara St. prior to calling in for a final Engineering. The sidewalk is being utilized in the assistance of the ADA clients for the school, it is a requirement by code.} ; {Activity date: 04/10/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - I met with Frank with Southgate Academy school at 850 West Valencia Road. The accessible walkway from the street to the building exceeds the maximum 2% slope. Frank was unable to provide permits and inspection history for this project but he explained that this is been going on for several years and that they opted to not do much of the work originally permitted, he also stated that there has been other inspections and that the final is the last inspection required. I asked Frank to reschedule for inspection and told him I get with my supervision to see what needed to be done.} |