Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP19-0009
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/09/2019 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
05/03/2019 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by CBELL1 - Re-calling for inspection on Tuesday. |
04/12/2019 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by CBELL1 - The contractor needs to pour a new sidewalk from the school to Santa Clara St. prior to calling in for a final Engineering. The sidewalk is being utilized in the assistance of the ADA clients for the school, it is a requirement by code. |
04/10/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by CBELL1 - I met with Frank with Southgate Academy school at 850 West Valencia Road. The accessible walkway from the street to the building exceeds the maximum 2% slope. Frank was unable to provide permits and inspection history for this project but he explained that this is been going on for several years and that they opted to not do much of the work originally permitted, he also stated that there has been other inspections and that the final is the last inspection required. I asked Frank to reschedule for inspection and told him I get with my supervision to see what needed to be done. |