Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
9210 S HOUGHTON RD
Apply Date:
01/14/2019
Applicant:
Description:
GRADING/SWPPP - Shops IV - Mod Pizza, Portions of lots 25-27.

Permit Reviews

Permit Number - DP19-0008
Permit Status: Complete
Permit Description: GRADING/SWPPP - Shops IV - Mod Pizza, Portions of lots 25-27.
Start Date Submittal Complete Date Status  
01/14/2019 DEV PKG - OK TO SUBMIT (GRADING ONLY) 01/15/2019 COMPLETED Review Details
01/15/2019 DEV PKG 02/14/2019 COMPLETED Review Details
03/04/2019 DEV PKG - RESUBMITTAL 03/06/2019 COMPLETED Review Details
03/14/2019 DEV PKG - RESUBMITTAL 03/22/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0008
Permit Description: GRADING/SWPPP - Shops IV - Mod Pizza, Portions of lots 25-27.
Total Completed Inspections - 9
Date Description Inspector Results Comments
10/29/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/29/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Went over stormwater pollution prevention details with general contractor. He said he was going to put up and all Controls and NOI Info at gate this week.}
11/19/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 11/19/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
11/19/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 11/19/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
11/19/2019 COT - ENGR - Signage Final Passed {Activity date: 11/19/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
03/18/2020 SITE - Stormwater Follow-up Passed {Activity date: 03/18/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - } ; {Activity date: 01/08/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - GC canceled inspection.} ; {Activity date: 12/09/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 11/19/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 11/15/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Met with GC about calling in for storm water inspection’s.}
03/18/2020 SITE - Stormwater Final Inspection Passed {Activity date: 03/18/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - }
03/24/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 03/24/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - } ; {Activity date: 03/18/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - Complete details from landscaping for staking trees}
04/15/2021 ENGR Engineering Final Passed {Activity date: 04/15/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/24/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - } ; {Activity date: 03/18/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - Sidewalks cross slope to trashing closure over 2%. Provide proper staking for landscaping for trees.}
04/15/2021 ENGR Grading Final Passed {Activity date: 04/15/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
AZ SWPPP.PDF DOCUMENTS VIEW
DRAINAGE STATEMENT.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT - 2928JH092.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW