Permit Details

Status:
Complete
Type:
Development Package
Address:
1617 W EL RIO DR
Address NEW:
1617 W EL RIO DR
Apply Date:
12/12/2018
Applicant:
Description:
SITE - Greenview Apts.

Permit Reviews

Permit Number - DP18-0299
Permit Status: Complete
Permit Description: SITE - Greenview Apts.
Start Date Submittal Complete Date Status  
08/26/2019 REVISION - - 1ST 09/18/2019 COMPLETED Review Details
12/12/2018 SITE and/or GRADING 12/27/2018 COMPLETED Review Details
12/27/2018 RESUB - SITE and/or GRADING 12/27/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0299
Permit Description: SITE - Greenview Apts.
Total Completed Inspections - 4
Date Description Inspector Results Comments
12/20/2019 ENGR Grading Final Passed {Activity date: 12/20/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by SFLORES2 - } ; {Activity date: 11/05/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor is installing carports, sidewalks and working on the new building and remodel work in units
Concrete another construction debris on site} ; {Activity date: 11/04/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Job trailer locked up tight at 3 PM. Will come by and reinspect earlier in the day}
12/20/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/20/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by SFLORES2 - } ; {Activity date: 11/05/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Job trailer is locked. Provide concrete containment area. Barricade the work area from the public.} ; {Activity date: 11/04/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Job trailer locked up tight at 3 PM. Will come by and reinspect earlier in the day}
05/12/2020 ENGR Engineering Final Passed {Activity date: 05/12/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 02/18/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - PARTIAL AT THIS TIME TILL A FULL SITE INSPECTION IS PERFORMED WITH THE CONTRACTOR TOMORROW MORNING.

} ; {Activity date: 12/20/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Kent provide city approved civil drawings, complete all work, remove construction debris and materials from site.}
05/12/2020 SITE - Stormwater Follow-up Passed {Activity date: 05/12/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 12/20/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - No issues at this time.} ; {Activity date: 11/19/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is no track out on El Rio.}

Documents

File Name Document Type  
1-3 OF 2.PDF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW
REVISION_LETTER, 08.23.19.PDF DOCUMENTS VIEW