Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP18-0299

Parcel: 11522129A


Addresses:

1617 W EL RIO DR

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
02/18/2020 ENGR Engineering Final DROBERTS Approved Entered by DMERANZ1 -
12/20/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by SFLORES2 - Kent provide city approved civil drawings, complete all work, remove construction debris and materials from site.
10/29/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - I spoke with the superintendent on site, Kent with Wilshire Pacific and asked him to schedule a preconstruction meeting under this permit.
05/12/2020 ENGR Engineering Final BBENEDON Approved Entered by RSALDAT1 -
02/18/2020 ENGR Engineering Final DROBERTS Partial Approval Entered by DMERANZ1 - PARTIAL AT THIS TIME TILL A FULL SITE INSPECTION IS PERFORMED WITH THE CONTRACTOR TOMORROW MORNING.
12/20/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by SFLORES2 - Kent provide city approved civil drawings, complete all work, remove construction debris and materials from site.