Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
210 W IRVINGTON RD
Apply Date:
07/30/2018
Applicant:
Description:
E SITE/GRADING/SWPPP - FAMILY DOLLAR

Permit Reviews

Permit Number - DP18-0182
Permit Status: Complete
Permit Description: E SITE/GRADING/SWPPP - FAMILY DOLLAR
Start Date Submittal Complete Date Status  
01/09/2019 DEV PKG - RESUBMITTAL 01/10/2019 COMPLETED Review Details
07/18/2018 DEV PKG - OK TO SUBMIT 07/30/2018 COMPLETED Review Details
07/25/2018 DEV PKG 08/29/2018 COMPLETED Review Details
09/11/2018 DEV PKG - RESUBMITTAL 10/10/2018 COMPLETED Review Details
10/30/2018 DEV PKG - RESUBMITTAL 12/03/2018 COMPLETED Review Details
12/06/2018 DEV PKG - RESUBMITTAL 01/07/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0182
Permit Description: E SITE/GRADING/SWPPP - FAMILY DOLLAR
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/10/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/10/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE ENGINEER OF RECORD JONATHAN D BURKHARDT PROVIDED THIS DEPARTMENT WITH A CERTIFICATION FOR THIS PROJECT ON 7/8/2019 THAT IS SEALED, STATING THAT ALL OF THE WORK WAS COMPLETED PER THE APPROVED EVEN THOUGH NOE OF THE WORK WAS INSPECTED BY THIS DEPARTMENT DURING THE CONSTRUCTION.} ; {Activity date: 07/03/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/01/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - The entire site, Below ground drainage systems and trash enclosure were all built without inspections. Contractor will provide letters from the engineer of record certifying that the site was graded per the plans, all below ground drainage piping and retention basins were installed per the plans and as required for the manufacture and that the trash enclosure was installed per city of Tucson detail six Dash 01.
Correct the drainage at the north end of the water harvesting depression. Install long-term bicycle parking in the location specified on the plan. Remove dirt and filter fabric from drainage openings. Drill holes to secure trash enclosure doors in the open position. Please schedule inspection when you’re ready.}
07/10/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/10/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE ENGINEER OF RECORD JONATHAN D BURKHARDT PROVIDED THIS DEPARTMENT WITH A CERTIFICATION FOR THIS PROJECT ON 7/8/2019 THAT IS SEALED, STATING THAT ALL OF THE WORK WAS COMPLETED PER THE APPROVED EVEN THOUGH NOE OF THE WORK WAS INSPECTED BY THIS DEPARTMENT DURING THE CONSTRUCTION.} ; {Activity date: 07/03/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/01/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - The entire site, Below ground drainage systems and trash enclosure were all built without inspections. Contractor will provide letters from the engineer of record certifying that the site was graded per the plans, all below ground drainage piping and retention basins were installed per the plans and as required for the manufacture and that the trash enclosure was installed per city of Tucson detail six Dash 01.
Correct the drainage at the north end of the water harvesting depression. Install long-term bicycle parking in the location specified on the plan. Remove dirt and filter fabric from drainage openings. Drill holes to secure trash enclosure doors in the open position. Please schedule inspection when you’re ready.}
07/10/2019 ENGR Engineering Final Passed {Activity date: 07/10/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE ENGINEER OF RECORD JONATHAN D BURKHARDT PROVIDED THIS DEPARTMENT WITH A CERTIFICATION FOR THIS PROJECT ON 7/8/2019 THAT IS SEALED, STATING THAT ALL OF THE WORK WAS COMPLETED PER THE APPROVED EVEN THOUGH NOE OF THE WORK WAS INSPECTED BY THIS DEPARTMENT DURING THE CONSTRUCTION.} ; {Activity date: 07/09/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - On-site corrections have been made, it is OK to approve this permit with the receipt and acceptance of stamped letters from the engineer of record for this project certifying that,
1- all below ground drainage piping , Catch basin and manhole, were installed per the city approved construction documents
2-that the trash enclosure was installed in accordance with city of Tucson standard detail 6-01.
3- All Grading for this project.} ; {Activity date: 07/03/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There’s been no change since yesterday’s inspection. Per conversation with Dave Roberts, I will approve intermediate inspections and will request that The contractor submit letters of certification from the engineer of record for this project, to zoning and engineering plan review for Final approval of all work installed without inspections.} ; {Activity date: 07/01/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - The entire site, Below ground drainage systems and trash enclosure were all built without inspections. Contractor will provide letters from the engineer of record certifying that the site was graded per the plans, all below ground drainage piping and retention basins were installed per the plans and as required for the manufacture and that the trash enclosure was installed per city of Tucson detail six Dash 01.
Correct the drainage at the north end of the water harvesting depression. Install long-term bicycle parking in the location specified on the plan. Remove dirt and filter fabric from drainage openings. Drill holes to secure trash enclosure doors in the open position. Please schedule inspection when you’re ready.}
07/10/2019 SITE - Stormwater Follow-up Passed {Activity date: 07/10/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE ENGINEER OF RECORD JONATHAN D BURKHARDT PROVIDED THIS DEPARTMENT WITH A CERTIFICATION FOR THIS PROJECT ON 7/8/2019 THAT IS SEALED, STATING THAT ALL OF THE WORK WAS COMPLETED PER THE APPROVED EVEN THOUGH NOE OF THE WORK WAS INSPECTED BY THIS DEPARTMENT DURING THE CONSTRUCTION.} ; {Activity date: 07/03/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - It shall be noted that all work was completed prior to any inspections.} ; {Activity date: 07/01/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - The entire site, Below ground drainage systems and trash enclosure were all built without inspections. Contractor will provide letters from the engineer of record certifying that the site was graded per the plans, all below ground drainage piping and retention basins were installed per the plans and as required for the manufacture and that the trash enclosure was installed per city of Tucson detail six Dash 01.
Correct the drainage at the north end of the water harvesting depression. Install long-term bicycle parking in the location specified on the plan. Remove dirt and filter fabric from drainage openings. Drill holes to secure trash enclosure doors in the open position. Please schedule inspection when you’re ready.}
07/10/2019 ENGR Grading Final Passed {Activity date: 07/10/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE ENGINEER OF RECORD JONATHAN D BURKHARDT PROVIDED THIS DEPARTMENT WITH A CERTIFICATION FOR THIS PROJECT ON 7/8/2019 THAT IS SEALED, STATING THAT ALL OF THE WORK WAS COMPLETED PER THE APPROVED EVEN THOUGH NOE OF THE WORK WAS INSPECTED BY THIS DEPARTMENT DURING THE CONSTRUCTION.} ; {Activity date: 07/03/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - It shall be noted that all work was completed prior to any inspections.} ; {Activity date: 07/01/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - The entire site, Below ground drainage systems and trash enclosure were all built without inspections. Contractor will provide letters from the engineer of record certifying that the site was graded per the plans, all below ground drainage piping and retention basins were installed per the plans and as required for the manufacture and that the trash enclosure was installed per city of Tucson detail six Dash 01.
Correct the drainage at the north end of the water harvesting depression. Install long-term bicycle parking in the location specified on the plan. Remove dirt and filter fabric from drainage openings. Drill holes to secure trash enclosure doors in the open position. Please schedule inspection when you’re ready.}
07/10/2019 SITE - Stormwater Final Inspection Passed {Activity date: 07/10/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE ENGINEER OF RECORD JONATHAN D BURKHARDT PROVIDED THIS DEPARTMENT WITH A CERTIFICATION FOR THIS PROJECT ON 7/8/2019 THAT IS SEALED, STATING THAT ALL OF THE WORK WAS COMPLETED PER THE APPROVED EVEN THOUGH NOE OF THE WORK WAS INSPECTED BY THIS DEPARTMENT DURING THE CONSTRUCTION.} ; {Activity date: 07/03/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - It shall be noted that all work was completed prior to any inspections.} ; {Activity date: 07/01/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - The entire site, Below ground drainage systems and trash enclosure were all built without inspections. Contractor will provide letters from the engineer of record certifying that the site was graded per the plans, all below ground drainage piping and retention basins were installed per the plans and as required for the manufacture and that the trash enclosure was installed per city of Tucson detail six Dash 01.
Correct the drainage at the north end of the water harvesting depression. Install long-term bicycle parking in the location specified on the plan. Remove dirt and filter fabric from drainage openings. Drill holes to secure trash enclosure doors in the open position. Please schedule inspection when you’re ready.}
07/10/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 07/10/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE ENGINEER OF RECORD JONATHAN D BURKHARDT PROVIDED THIS DEPARTMENT WITH A CERTIFICATION FOR THIS PROJECT ON 7/8/2019 THAT IS SEALED, STATING THAT ALL OF THE WORK WAS COMPLETED PER THE APPROVED EVEN THOUGH NOE OF THE WORK WAS INSPECTED BY THIS DEPARTMENT DURING THE CONSTRUCTION.} ; {Activity date: 07/03/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - It shall be noted that all work was completed prior to any inspections.} ; {Activity date: 07/01/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - The entire site, Below ground drainage systems and trash enclosure were all built without inspections. Contractor will provide letters from the engineer of record certifying that the site was graded per the plans, all below ground drainage piping and retention basins were installed per the plans and as required for the manufacture and that the trash enclosure was installed per city of Tucson detail six Dash 01.
Correct the drainage at the north end of the water harvesting depression. Install long-term bicycle parking in the location specified on the plan. Remove dirt and filter fabric from drainage openings. Drill holes to secure trash enclosure doors in the open position. Please schedule inspection when you’re ready.}
07/10/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/10/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE ENGINEER OF RECORD JONATHAN D BURKHARDT PROVIDED THIS DEPARTMENT WITH A CERTIFICATION FOR THIS PROJECT ON 7/8/2019 THAT IS SEALED, STATING THAT ALL OF THE WORK WAS COMPLETED PER THE APPROVED EVEN THOUGH NOE OF THE WORK WAS INSPECTED BY THIS DEPARTMENT DURING THE CONSTRUCTION.} ; {Activity date: 07/03/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - It shall be noted that all work was completed prior to any inspections.} ; {Activity date: 07/01/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - The entire site, Below ground drainage systems and trash enclosure were all built without inspections. Contractor will provide letters from the engineer of record certifying that the site was graded per the plans, all below ground drainage piping and retention basins were installed per the plans and as required for the manufacture and that the trash enclosure was installed per city of Tucson detail six Dash 01.
Correct the drainage at the north end of the water harvesting depression. Install long-term bicycle parking in the location specified on the plan. Remove dirt and filter fabric from drainage openings. Drill holes to secure trash enclosure doors in the open position. Please schedule inspection when you’re ready.}
07/10/2019 COT - ENGR - Signage Final Passed {Activity date: 07/10/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE ENGINEER OF RECORD JONATHAN D BURKHARDT PROVIDED THIS DEPARTMENT WITH A CERTIFICATION FOR THIS PROJECT ON 7/8/2019 THAT IS SEALED, STATING THAT ALL OF THE WORK WAS COMPLETED PER THE APPROVED EVEN THOUGH NOE OF THE WORK WAS INSPECTED BY THIS DEPARTMENT DURING THE CONSTRUCTION.} ; {Activity date: 07/03/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - It shall be noted that all work was completed prior to any inspections.} ; {Activity date: 07/01/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - The entire site, Below ground drainage systems and trash enclosure were all built without inspections. Contractor will provide letters from the engineer of record certifying that the site was graded per the plans, all below ground drainage piping and retention basins were installed per the plans and as required for the manufacture and that the trash enclosure was installed per city of Tucson detail six Dash 01.
Correct the drainage at the north end of the water harvesting depression. Install long-term bicycle parking in the location specified on the plan. Remove dirt and filter fabric from drainage openings. Drill holes to secure trash enclosure doors in the open position. Please schedule inspection when you’re ready.}

Documents

File Name Document Type  
1-12 OF 12.PDF DEVELOPMENT PACKAGE VIEW
DP18-0182 AS-BUILT SURVEY REVIEW LETTER.PDF DEVELOPMENT PACKAGE VIEW
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
COMMENT_RESPONSE_LETTER.PDF DOCUMENTS VIEW
STROMWATER_RETENTION_REPORT.PDF DOCUMENTS VIEW
COMMENT_RESPONSE_LETTER.PDF DOCUMENTS VIEW
COMMENT_RESPONSE_LETTER.PDF DOCUMENTS VIEW
COMMENT_RESPONSE_LETTER.PDF DOCUMENTS VIEW
LOT_COMBO_FORM.PDF DOCUMENTS VIEW