Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
2900 E ELVIRA RD
Apply Date:
06/01/2018
Applicant:
Description:
SITE/GRADE - SION POWER TEST EQUIPMENT BUILDING

Permit Reviews

Permit Number - DP18-0132
Permit Status: Complete
Permit Description: SITE/GRADE - SION POWER TEST EQUIPMENT BUILDING
Start Date Submittal Complete Date Status  
06/01/2018 DEV PKG - OK TO SUBMIT 06/06/2018 COMPLETED Review Details
06/06/2018 SITE and/or GRADING 07/10/2018 COMPLETED Review Details
08/16/2018 RESUB - SITE and/or GRADING 08/21/2018 COMPLETED Review Details
08/22/2018 DEV PKG - RESUBMITTAL 09/21/2018 COMPLETED Review Details
09/21/2018 DEV PKG - RESUBMITTAL 10/16/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0132
Permit Description: SITE/GRADE - SION POWER TEST EQUIPMENT BUILDING
Total Completed Inspections - 9
Date Description Inspector Results Comments
11/27/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 11/27/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 11/21/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Track out protection installed, waddle installed along west side of property.}
09/06/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/06/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/15/2018; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - engineering pre-construction meeting, partially approved. Inspection left open for information only, Keith 400 0618
New building on existing site. Provide stormwater controls as needed. Call for stormwater inspections every couple of weeks}
09/20/2019 SITE - Stormwater Final Inspection Passed {Activity date: 09/20/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/06/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Remove controls and stabilize disturbed earth.}
09/23/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/06/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Pete with Kappcon, Provide city approved civil drawings. Complete all work shown and provide documentation for any changes}
09/23/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - }
09/23/2019 ENGR Engineering Final Passed {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/06/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Pete with Kappcon, Provide city approved civil drawings. Complete all work shown and provide documentation for any changes}
09/23/2019 SITE - Stormwater Follow-up Passed {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/06/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/20/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time.} ; {Activity date: 03/06/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The contractor is doing a great job keeping the site contain track of protection is maintained, waddle has been maintained, there are no concerns at this time.} ; {Activity date: 02/14/2019; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - unsch insp, no issues, I asked Kieth to call in for inspections} ; {Activity date: 11/27/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Only concern is the large dirt pile against fence. Keith will have it removed before the scheduled rain this weekend.}
09/23/2019 ENGR Grading Final Passed {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - }
09/23/2019 COT - ENGR - Signage Final Passed {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - }

Documents

File Name Document Type  
001_SHEET 1 OF 4.TIF DEVELOPMENT PACKAGE VIEW
002_SHEET 2 OF 4.TIF DEVELOPMENT PACKAGE VIEW
003_SHEET 3 OF 4.TIF DEVELOPMENT PACKAGE VIEW
004_SHEET 4 OF 4.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW