Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP18-0132
Permit Details
Apply Date:
06/01/2018
Applicant:
Description:
SITE/GRADE - SION POWER TEST EQUIPMENT BUILDING
Permit Reviews
Permit Number - DP18-0132
Permit Status: Complete
Permit Description: SITE/GRADE - SION POWER TEST EQUIPMENT BUILDING
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/01/2018 | DEV PKG - OK TO SUBMIT | 06/06/2018 | COMPLETED |
06/06/2018 | SITE and/or GRADING | 07/10/2018 | COMPLETED |
08/16/2018 | RESUB - SITE and/or GRADING | 08/21/2018 | COMPLETED |
08/22/2018 | DEV PKG - RESUBMITTAL | 09/21/2018 | COMPLETED |
09/21/2018 | DEV PKG - RESUBMITTAL | 10/16/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0132
Permit Description: SITE/GRADE - SION POWER TEST EQUIPMENT BUILDING
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/27/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 11/27/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 11/21/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Track out protection installed, waddle installed along west side of property.} | |
09/06/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/06/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/15/2018; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - engineering pre-construction meeting, partially approved. Inspection left open for information only, Keith 400 0618 New building on existing site. Provide stormwater controls as needed. Call for stormwater inspections every couple of weeks} |
|
09/20/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 09/20/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/06/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Remove controls and stabilize disturbed earth.} | |
09/23/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/06/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Pete with Kappcon, Provide city approved civil drawings. Complete all work shown and provide documentation for any changes} | |
09/23/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } | |
09/23/2019 | ENGR Engineering Final | Passed | {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/06/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Pete with Kappcon, Provide city approved civil drawings. Complete all work shown and provide documentation for any changes} | |
09/23/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/06/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/20/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time.} ; {Activity date: 03/06/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The contractor is doing a great job keeping the site contain track of protection is maintained, waddle has been maintained, there are no concerns at this time.} ; {Activity date: 02/14/2019; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - unsch insp, no issues, I asked Kieth to call in for inspections} ; {Activity date: 11/27/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Only concern is the large dirt pile against fence. Keith will have it removed before the scheduled rain this weekend.} | |
09/23/2019 | ENGR Grading Final | Passed | {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } | |
09/23/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } |