PLAT/FLD - Tres Pueblos Estes, Block 1, Lots 1-156.1st Revision, pending Dec. 2020 - Plan sheets
Permit Reviews
Permit Number - DP18-0107
Permit Status: Complete
Permit Description: PLAT/FLD - Tres Pueblos Estes, Block 1, Lots 1-156.1st Revision, pending Dec. 2020 - Plan sheets
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/03/2018 | DEV PKG - OK TO SUBMIT | 05/09/2018 | COMPLETED |
05/09/2018 | DEV PKG | 06/08/2018 | COMPLETED |
08/22/2018 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 10/26/2018 | COMPLETED |
10/26/2018 | DEV PKG - RESUBMITTAL | 11/30/2018 | COMPLETED |
12/03/2020 | DEV PKG - OK TO SUBMIT | 12/23/2020 | COMPLETED |
12/18/2018 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 12/19/2018 | COMPLETED |
12/23/2020 | REVISION - - 1ST | 02/11/2021 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0107
Permit Description: PLAT/FLD - Tres Pueblos Estes, Block 1, Lots 1-156.1st Revision, pending Dec. 2020 - Plan sheets
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/14/2020 | ENGR Grading Final | Passed | {Activity date: 08/14/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 08/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Need to review plan for grouted riprap overflow drainage a long northern portion of sight west of play area. Water has no place to escape, And the bottom is grouted.} | |
02/12/2021 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 02/12/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - } | |
02/12/2021 | ENGR Engineering Final | Passed | {Activity date: 02/12/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - } ; {Activity date: 09/14/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Not ready. Construction debris and unstabilized dirt along the north side perimeter } ; {Activity date: 12/18/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Courtesy inspection for John Vanwinkle. This permit appears to be in coordination with DP18 Dash0212, but has only 4 inspection designations. There are plans in pro they are 31 pages in length. Eagle rock and DR Horton. The site has been graded and new home construction has started} |
|
02/25/2021 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 02/25/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/12/2021; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by VLEON1 - NOT READY AT THIS TIME. ALL PLANTING MATERIAL NEEDS TO BE INSTALLED PRIOR TO REQUESTING THIS FINAL INSPECTION. THIS WILL INCLUDE THE PLACEMENT OF ALL TREES, PLANTS, SHRUBS, AND DECOMPOSED GRANITE THROUGHOUT THIS SITE. ALL OF THESE REQUIREMENTS ARE PART OF THE DEVELOPMENT PACKAGE AND WILL NEED TO BE AT A FULL AND FINAL STATE DURING THE FINAL INSPECTION. } ; {Activity date: 08/13/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved. West perimeter} ; {Activity date: 06/25/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Landscapers installing along perimeter and in front of individual homes. Trees are being double staked as they are installed.} |