Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
5975 S TUCSON BL
Apply Date:
05/03/2018
Applicant:
Tri Miller
Description:
PLAT/FLD - Tres Pueblos Estes, Block 1, Lots 1-156.1st Revision, pending Dec. 2020 - Plan sheets

Permit Reviews

Permit Number - DP18-0107
Permit Status: Complete
Permit Description: PLAT/FLD - Tres Pueblos Estes, Block 1, Lots 1-156.1st Revision, pending Dec. 2020 - Plan sheets
Start Date Submittal Complete Date Status  
05/03/2018 DEV PKG - OK TO SUBMIT 05/09/2018 COMPLETED Review Details
05/09/2018 DEV PKG 06/08/2018 COMPLETED Review Details
08/22/2018 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 10/26/2018 COMPLETED Review Details
10/26/2018 DEV PKG - RESUBMITTAL 11/30/2018 COMPLETED Review Details
12/03/2020 DEV PKG - OK TO SUBMIT 12/23/2020 COMPLETED Review Details
12/18/2018 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 12/19/2018 COMPLETED Review Details
12/23/2020 REVISION - - 1ST 02/11/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0107
Permit Description: PLAT/FLD - Tres Pueblos Estes, Block 1, Lots 1-156.1st Revision, pending Dec. 2020 - Plan sheets
Total Completed Inspections - 4
Date Description Inspector Results Comments
08/14/2020 ENGR Grading Final Passed {Activity date: 08/14/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 08/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Need to review plan for grouted riprap overflow drainage a long northern portion of sight west of play area. Water has no place to escape, And the bottom is grouted.}
02/12/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 02/12/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - }
02/12/2021 ENGR Engineering Final Passed {Activity date: 02/12/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - } ; {Activity date: 09/14/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Not ready. Construction debris and unstabilized dirt along the north side perimeter

} ; {Activity date: 12/18/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Courtesy inspection for John Vanwinkle. This permit appears to be in coordination with DP18 Dash0212, but has only 4 inspection designations. There are plans in pro they are 31 pages in length. Eagle rock and DR Horton. The site has been graded and new home construction has started}
02/25/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 02/25/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/12/2021; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by VLEON1 - NOT READY AT THIS TIME. ALL PLANTING MATERIAL NEEDS TO BE INSTALLED PRIOR TO REQUESTING THIS FINAL INSPECTION. THIS WILL INCLUDE THE PLACEMENT OF ALL TREES, PLANTS, SHRUBS, AND DECOMPOSED GRANITE THROUGHOUT THIS SITE. ALL OF THESE REQUIREMENTS ARE PART OF THE DEVELOPMENT PACKAGE AND WILL NEED TO BE AT A FULL AND FINAL STATE DURING THE FINAL INSPECTION.

} ; {Activity date: 08/13/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved. West perimeter} ; {Activity date: 06/25/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Landscapers installing along perimeter and in front of individual homes. Trees are being double staked as they are installed.}

Documents

File Name Document Type  
LETTER REVISION #1, 12.03.20.PDF DOCUMENTS VIEW
1-31 OF 31.PDF DEVELOPMENT PACKAGE VIEW
TENT. PLAT COT_PERMIT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CITY FLD NOTIFICATION DP18-0107.PDF DOCUMENTS VIEW
1_DP18-0107_ADDRESSING.PDF DOCUMENTS VIEW
WATER 14026003Q.PDF DOCUMENTS VIEW
APPLICANT NEIGHBORHOOD MEETING MATERIALS.PDF DOCUMENTS VIEW
DRAINAGE_ADDENDUM-01.PDF DOCUMENTS VIEW
LETTER OF AUTHORIZATION.PDF DOCUMENTS VIEW
GEO REPORT.PDF DOCUMENTS VIEW
TIA.PDF DOCUMENTS VIEW
2 TP RESPONSE LETTER.PDF DOCUMENTS VIEW
TRES PUEBLOS ESTE ORIGINAL DRAINAGE REPORT 3436-DRAINAGE REPORT.PDF DOCUMENTS VIEW
3 2ND COMMENT RESPONSE LTR.PDF DOCUMENTS VIEW
4 COMMENT RESPONSE LTR.PDF DOCUMENTS VIEW