Description:
GRADING

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0062
Permit Description: GRADING
Total Completed Inspections - 9
Date Description Inspector Results Comments
01/07/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/05/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The nursery is still in place. There was a pile of discarded cacti as well as cactus trimmings and other debris. Approved plans are not on site, the wrong plans were left.} ; {Activity date: 12/04/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - see previously documented notes.} ; {Activity date: 06/13/2018; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I HAVE NOTED THAT A SMALL NURSARY HAS BEEN DEVELOPED ON THIS SITE FOR THE NPPO PLANTS THAT ARE TO BE UTILIZED DURING THIS PROJECT. THE PLANS ARE NOT AVAILABLE ON SITE AT THIS TIME AND WILL BE CHECKED AT A LATER DATE TO ENSURE THAT ALL PLANTS HAVE BEEN SALVAGED ACCORDINGLY.}
01/07/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/05/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - The site is still under construction.} ; {Activity date: 12/04/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Inspector requires more time to complete inspection, we'll revisit site tomorrow.}
01/07/2019 ENGR Engineering Final Passed {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/04/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Complete all required inspections prior to calling in for final inspection.}
01/07/2019 SITE - Stormwater Follow-up Passed {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/05/2018; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - Due to track out into the street and failure to call for inspections on a regular basis.} ; {Activity date: 12/04/2018; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - See the notes from Dave Roberts dated June 13th 2018} ; {Activity date: 06/13/2018; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I HAVE ADVISED ANDREW THAT HE NEEDS TO SCHEDULE THIS INSPECTION EVRY 2 WEEKS THROUGH THE DURATION OF THIS PERMIT. THE FOLLOWING ITEMS WILL NEED ATTENTION IN THE NEXT 2 WEEKS.
1) CONCRETE HAS BEEN PLACED ON GRADE AT DIFFERENT LOCATIONS WITHIN THIS SITE. THIS MATERIAL NEEDS TO BE CLEANED UP PRIOR TO THE NEXT INSPECTION.
GENERAL SITE CLEANUP IS NEEDED PRIOR TO THE NEXT SCHEDULED INSPECTION.}
01/07/2019 ENGR Grading Final Passed {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/07/2019 SITE - Stormwater Final Inspection Passed {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/07/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/05/2018; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - No controls are installed, and there is track out into the street.} ; {Activity date: 12/04/2018; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - Inspection required prior to final.}
01/07/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/07/2019 COT - ENGR - Signage Final Passed {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/04/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - No inspection required.}