Permit: DP18-0062
Permit Details
Status:
Complete
Type:
Development Package
Address:
1535 N CAMINO MIRAFLORES
Address NEW:
1535 N CAMINO MIRAFLORES
Apply Date:
03/21/2018
Applicant:
Gabriel Carranza
Description:
GRADING
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0062
Permit Description: GRADING
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/05/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The nursery is still in place. There was a pile of discarded cacti as well as cactus trimmings and other debris. Approved plans are not on site, the wrong plans were left.} ; {Activity date: 12/04/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - see previously documented notes.} ; {Activity date: 06/13/2018; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I HAVE NOTED THAT A SMALL NURSARY HAS BEEN DEVELOPED ON THIS SITE FOR THE NPPO PLANTS THAT ARE TO BE UTILIZED DURING THIS PROJECT. THE PLANS ARE NOT AVAILABLE ON SITE AT THIS TIME AND WILL BE CHECKED AT A LATER DATE TO ENSURE THAT ALL PLANTS HAVE BEEN SALVAGED ACCORDINGLY.} | |
| 01/07/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/05/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - The site is still under construction.} ; {Activity date: 12/04/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Inspector requires more time to complete inspection, we'll revisit site tomorrow.} | |
| 01/07/2019 | ENGR Engineering Final | Passed | {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/04/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Complete all required inspections prior to calling in for final inspection.} | |
| 01/07/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/05/2018; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - Due to track out into the street and failure to call for inspections on a regular basis.} ; {Activity date: 12/04/2018; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - See the notes from Dave Roberts dated June 13th 2018} ; {Activity date: 06/13/2018; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I HAVE ADVISED ANDREW THAT HE NEEDS TO SCHEDULE THIS INSPECTION EVRY 2 WEEKS THROUGH THE DURATION OF THIS PERMIT. THE FOLLOWING ITEMS WILL NEED ATTENTION IN THE NEXT 2 WEEKS. 1) CONCRETE HAS BEEN PLACED ON GRADE AT DIFFERENT LOCATIONS WITHIN THIS SITE. THIS MATERIAL NEEDS TO BE CLEANED UP PRIOR TO THE NEXT INSPECTION. GENERAL SITE CLEANUP IS NEEDED PRIOR TO THE NEXT SCHEDULED INSPECTION.} |
|
| 01/07/2019 | ENGR Grading Final | Passed | {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 01/07/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 01/07/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/05/2018; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - No controls are installed, and there is track out into the street.} ; {Activity date: 12/04/2018; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - Inspection required prior to final.} | |
| 01/07/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 01/07/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 01/07/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/04/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - No inspection required.} |