Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP18-0062

Parcel: 116061790

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
01/07/2019 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
12/04/2018 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - Complete all required inspections prior to calling in for final inspection.
01/07/2019 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
12/05/2018 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - No contact information provided and the Approved plan is not on site, the plan provided is for 4360 South Sky High, also the site is still under construction. There are Construction materials and debris on-site.
12/04/2018 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - No contact information provided. Inspector requires more time to complete inspection. I will revisit the site tomorrow.