Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Address:
4975 E BENSON HY
Apply Date:
03/07/2018
Applicant:
Description:
TENTATIVE PLAT/FLD/GRADE/SWPPP - Valencia Crossing, Neighborhoods 3 & 4, Lots 1-162.

Permit Reviews

Permit Number - DP18-0053
Permit Status: Issued
Permit Description: TENTATIVE PLAT/FLD/GRADE/SWPPP - Valencia Crossing, Neighborhoods 3 & 4, Lots 1-162.
Start Date Submittal Complete Date Status  
03/05/2018 DEV PKG - OK TO SUBMIT 03/08/2018 COMPLETED Review Details
03/09/2018 TENTATIVE PLAT REVIEW 04/18/2018 COMPLETED Review Details
04/27/2020 DEV PKG - OK TO SUBMIT 05/28/2020 COMPLETED Review Details
05/14/2018 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 09/11/2018 COMPLETED Review Details
06/09/2020 REVISION - - 2ND 07/17/2020 COMPLETED Review Details
06/26/2019 REVISION - - 1ST 05/26/2020 COMPLETED Review Details
07/23/2020 DEV PKG - OK TO SUBMIT 08/27/2020 COMPLETED Review Details
09/18/2018 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 06/04/2019 COMPLETED Review Details
04/21/2023 AS-BUILT v.1 04/27/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - DP18-0053
Permit Status: Issued
Permit Description: TENTATIVE PLAT/FLD/GRADE/SWPPP - Valencia Crossing, Neighborhoods 3 & 4, Lots 1-162.
Total Outstanding Activity Conditions - 1
Date Name
03/15/2018 General Note, FLD Subdivision Notes #4, on sheet 1 states Architectural Variation Plan (AVP) will be deferred revision prior to building permit. Transition Edge Treatment is not applicable so no Privacy Mitigation Plan (PMP) required.

Outstanding Inspections

Permit Status: Issued
Permit Number: DP18-0053
Permite Description: TENTATIVE PLAT/FLD/GRADE/SWPPP - Valencia Crossing, Neighborhoods 3 & 4, Lots 1-162.
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
10/22/2021 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 10/22/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NO CONCERNS AT THIS TIME} ; {Activity date: 12/02/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 12/01/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 11/17/2020; Status: Continued; Inspector: RDELONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.

} ; {Activity date: 11/10/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 11/03/2020; Status: Continued; Inspector: RDELONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.

} ; {Activity date: 10/26/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - 09154 stormwater follow up inspection. Continue. No concerns at this time.

} ; {Activity date: 10/12/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - CONTINUED AT THIS TIME, NO CONCERNS ON THIS SITE AT THIS TIME} ; {Activity date: 09/25/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 09/23/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 09/10/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 09/02/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 08/26/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/12/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 07/31/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 07/15/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time} ; {Activity date: 07/01/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 06/22/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concern at this time. Grading contractor working on utilities and Rodeway Inn to site.} ; {Activity date: 06/03/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Talked with Bob Mallory from Eagle rock he said he was adding track out rock later today.} ; {Activity date: 05/08/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CONTINUED AT THIS TIME NO CONCERNS DURING THIS SITE VISIT.} ; {Activity date: 04/22/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - No concerns at this time.} ; {Activity date: 04/10/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 03/31/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by SFLORES2 - THERE ARE NO CONCERNS AT THIS TIME. I DROVE THROUGH THE SITE TO SEE WHAT TYPE OF WORK IS STILL HAPPENINGS, CREWS ARE STILL WORKING ON INSTALLING THE UTILITY PIPES FOR SEWER.

} ; {Activity date: 03/12/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - No concerns at this time.} ; {Activity date: 02/12/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Not able to access site due to rain. No activity on site due to rain.} ; {Activity date: 01/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Some muddy track out to be noted on Valencia Road. Check out protection needs to be beefed up and I’ll track out needs to be swept. Post site address.} ; {Activity date: 01/09/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - NO CONCERNS AT THIS TIME ALL CONTROLS ARE WORKING.} ; {Activity date: 12/06/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 09/12/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Talk to Bob Mallory about adding track out rock the entrance other than that no concerns at this time.} ; {Activity date: 08/20/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Perimeter V ditch with protection on Outlet. Mr. tree working on NPPO.} ; {Activity date: 08/13/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Please post your address at site entrance.}
10/22/2021 PDSD Engineering Division Pre-Construction SITE N/A Complete (Recurring) {Activity date: 10/22/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NO CONCERNS AT THIS TIME}
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/27/2022 COT - ENGR - Signage Final N/A Not Ready
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready
10/27/2022 ENGR Grading Final N/A Not Ready
10/26/2022 SITE - Stormwater Final Inspection N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: DP18-0053
Permit Description: TENTATIVE PLAT/FLD/GRADE/SWPPP - Valencia Crossing, Neighborhoods 3 & 4, Lots 1-162.
Total Completed Inspections - 7
Date Description Inspector Results Comments
10/22/2021 SITE - Stormwater Setup and Controls Passed {Activity date: 10/22/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/23/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Met with Bob Mallory on site going to add more track out rock. Used a cut and burn for Rodeway Into site.}
07/11/2023 PDSD Site/Engineering Division - NPPO Passed
07/11/2023 COT - ENGR - Signage Final Passed
08/25/2023 PDSD Site/Engineering Division - Landscaping Passed
08/25/2023 ENGR Engineering Final Passed
08/25/2023 ENGR Grading Final Passed
08/25/2023 SITE - Stormwater Final Inspection Passed

Documents

File Name Document Type  
STAMPED AS-BUILT.PDF DOCUMENTS VIEW
AS-BUILT STAMPED.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
AS BUILT APPROVED REV-3_DP PLAN 1ST SUBMITTAL__2023_04_19_V1_V1.PDF DOCUMENTS VIEW
DP18-0053_V1 (1)_V1.PDF DOCUMENTS VIEW
TRANSPORTATION FINAL ACCEPTANCE LTR, INFRASTRUCTURE, 08.08.21.PDF DOCUMENTS VIEW
TUCSON WATER, APPROVAL LETTER, PHASE THREE, MARCH 2021.PDF DOCUMENTS VIEW
TRANSPORTATION FINAL ACCEPTANCE LTR, NEIGH 3 AND 4, DATE 08.08.21.PDF DOCUMENTS VIEW
PIMA CO WASTEWATER, APPROVAL LETTER, 01.12.21.PDF DOCUMENTS VIEW
LENNARAVP VALENCIACROSSINGNARRATIVE5-8-2020.PDF DOCUMENTS VIEW
VALENCIA CROSSING LOT RELEASE EXAMPLE MAP.PDF DOCUMENTS VIEW
VALENCIA CROSSING LOT SIZE GROUPING MAP.PDF DOCUMENTS VIEW
REVISION LETTER, 05.26.2020.PDF DOCUMENTS VIEW
VALENCIA CROSSING PLAN 352.PDF DOCUMENTS VIEW
VALENCIA CROSSING PLAN 454.PDF DOCUMENTS VIEW
VALENCIA CROSSING PLAN 453.PDF DOCUMENTS VIEW
VALENCIA CROSSING PLAN 451.PDF DOCUMENTS VIEW
VALENCIA CROSSING PLAN 452.PDF DOCUMENTS VIEW
VALENCIA CROSSING PLAN 353.PDF DOCUMENTS VIEW
VALENCIA CROSSING PLAN 355.PDF DOCUMENTS VIEW
VALENCIA CROSSING PLAN 351.PDF DOCUMENTS VIEW
VALENCIA CROSSING PLAN 354.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CDRC_PRESUB_NOTES.PDF DOCUMENTS VIEW
OCZ_ORDINANCE 10982_C15-12-01.PDF DOCUMENTS VIEW
REZONING_ORDINANCE 10984_C9-12-03.PDF DOCUMENTS VIEW
NEIGHBORHOOD_MEETING_NOTICE.PDF DOCUMENTS VIEW
CERTIFIED_MAILING_LABELS.PDF DOCUMENTS VIEW
NEIGHBORHOOD_MEETING_SIGN-IN.PDF DOCUMENTS VIEW
NEIGHBORHOOD_MEETING_NOTES.PDF DOCUMENTS VIEW
AZSWPPP_2017_02_27.PDF DOCUMENTS VIEW
TITLE COMMITMENT.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
DRAINAGE_REPORT.PDF DOCUMENTS VIEW
RESP01_DP.PDF DOCUMENTS VIEW
RFC PRELIMINARY SEWER LAYOUT_COMMENT_RESPONSE.PDF DOCUMENTS VIEW
ADDRESSING_COMMENT_RESPONSE.PDF DOCUMENTS VIEW
TIA.PDF DOCUMENTS VIEW
VALENCIA CROSSING DRC LETTER.PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW
CITY NOTIFICATION FOR FLD.PDF DOCUMENTS VIEW
1S_DP18-0053_ADDRESSING.PDF DOCUMENTS VIEW
2A_DP18-0053_ADDRESSING.PDF DOCUMENTS VIEW
CORRECTED TITLE REPORT.PDF DOCUMENTS VIEW
REVISION 1 EXPLANATION LETTER.PDF DOCUMENTS VIEW
RETURNED MAILING.PDF DOCUMENTS VIEW
1-44 OF 44.PDF DEVELOPMENT PACKAGE VIEW