Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP18-0053
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
12/16/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VVERA1 - CN NO WATER AT BOTTOM OF THE BASINS |
10/22/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED, MOST COMMON AREA WORK IS AT 90%, THIS SITE IS MAINLY GOING VERTICAL AT THIS TIME FOR HOMES |
11/24/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by PAHUMAD1 - Continue. Installing riprap and drainage areas. |
08/10/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue.Working on grading streets and pouring curbs. |
05/08/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CREWS ARE STILL WORKING ON THE INSTALLATION OF UTILITIES AND SITE GRADING. |
01/09/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by DMERANZ1 - CONTRACTOR CONTINUES TO WORK ON THE UNDERGROUND AND GRADING WORK THROUGHOUT THIS SITE. |
07/11/2023 | ENGR Grading Final | Not Ready | Complete the changes to the drainage on this site adjacent to the common area be hind lots five through 11. Once this has been completed, provide documentation showing that you have met the great changes that were required per the approved plan and recall this inspection for an on site visit. | |
07/11/2023 | ENGR Grading Final | Not Ready | Complete the drainage modifications as noted on the approved as built plans and provide documentation verifying the drainage has been completed and showing prior to calling the site for a final inspection | |
07/11/2023 | ENGR Grading Final | Not Ready | Complete the drainage modifications as noted on the approved as built plans and provide documentation verifying the drainage has been completed and showing prior to calling the site for a final inspection | |
08/25/2023 | ENGR Grading Final | Passed | ||
08/25/2023 | ENGR Grading Final | Passed | ||
08/25/2023 | ENGR Grading Final | Passed |