Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
02/12/2018
Applicant:
Description:
SITE/GRADING - COT PUBLIC SAFETY

Permit Reviews

Permit Number - DP18-0041
Permit Status: Complete
Permit Description: SITE/GRADING - COT PUBLIC SAFETY
Start Date Submittal Complete Date Status  
02/12/2018 DEV PKG - OK TO SUBMIT 02/13/2018 COMPLETED Review Details
02/13/2018 GRADING 03/15/2018 COMPLETED Review Details
03/15/2018 SITE and/or GRADING 04/19/2018 COMPLETED Review Details
05/08/2018 REVISION - - 1ST 05/08/2018 COMPLETED Review Details
08/21/2018 REVISION - - 1ST 09/06/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0041
Permit Description: SITE/GRADING - COT PUBLIC SAFETY
Total Completed Inspections - 9
Date Description Inspector Results Comments
04/11/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/11/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE HAS BEEN HALF COMPLETED PRIOR TO A SITE INSPECTION BEING CALLED IN.
2) ENSURE YOU COMPLY WITH YOUR SWPPP AND AZPDES PERMIT
3) POST A COPY OF YOUR NOI AT ENTRANCE TO THE SITE
4) PERFORM AND DOCUMENT YOUR STORM WATER SELF INSPECTIONS
5) CALL FOR INSPECTION PRIOR TO COVERING STORM PIPE INSTALL
6) PROVIDE AN APPROVED PLAN THAT ACCURATELY REFLECTS WHAT WILL BE CONSTRUCTED.}
08/22/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/22/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
08/22/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 08/22/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
08/22/2018 SITE - Stormwater Follow-up Passed {Activity date: 08/22/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 04/26/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) RE-BAR INSTALLED PER APPROVED PLAN FOR HEAVY DUTY PAVING #5 BAR AT 18" OC BOTHWAYS , OK FOR CONCRETE
2) NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 04/25/2018; Status: Cancelled; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/13/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONTACT ON SITE} ; {Activity date: 04/11/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE HAS BEEN HALF COMPLETED PRIOR TO A SITE INSPECTION BEING CALLED IN.
2) ENSURE YOU COMPLY WITH YOUR SWPPP AND AZPDES PERMIT
3) POST A COPY OF YOUR NOI AT ENTRANCE TO THE SITE
4) PERFORM AND DOCUMENT YOUR STORM WATER SELF INSPECTIONS
5) CALL FOR INSPECTION PRIOR TO COVERING STORM PIPE INSTALL
6) PROVIDE AN APPROVED PLAN THAT ACCURATELY REFLECTS WHAT WILL BE CONSTRUCTED.}
08/22/2018 ENGR Grading Final Passed {Activity date: 08/22/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
08/22/2018 SITE - Stormwater Final Inspection Passed {Activity date: 08/22/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
08/22/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 08/22/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
08/22/2018 COT - ENGR - Signage Final Passed {Activity date: 08/22/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/08/2020 ENGR Engineering Final Passed {Activity date: 01/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/22/2018; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE CERT LETTER FROM ENGINEER OF RECORD FOR GRADING AND DRAINAGE ON AP PLANS.} ; {Activity date: 04/11/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE HAS BEEN HALF COMPLETED PRIOR TO A SITE INSPECTION BEING CALLED IN.
2) ENSURE YOU COMPLY WITH YOUR SWPPP AND AZPDES PERMIT
3) POST A COPY OF YOUR NOI AT ENTRANCE TO THE SITE
4) PERFORM AND DOCUMENT YOUR STORM WATER SELF INSPECTIONS
5) CALL FOR INSPECTION PRIOR TO COVERING STORM PIPE INSTALL
6) PROVIDE AN APPROVED PLAN THAT ACCURATELY REFLECTS WHAT WILL BE CONSTRUCTED.}