Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP18-0041
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/22/2018 | SITE - Stormwater Follow-up | RLEDONNE | Approved | Entered by RLEDONN1 - |
04/26/2018 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) RE-BAR INSTALLED PER APPROVED PLAN FOR HEAVY DUTY PAVING #5 BAR AT 18" OC BOTHWAYS , OK FOR CONCRETE 2) NO STORM WATER CONCERNS AT THIS TIME |
04/25/2018 | SITE - Stormwater Follow-up | MRUSSO | Cancelled | Entered by DROBERT5 - |
04/13/2018 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO CONTACT ON SITE |
04/11/2018 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) SITE HAS BEEN HALF COMPLETED PRIOR TO A SITE INSPECTION BEING CALLED IN. 2) ENSURE YOU COMPLY WITH YOUR SWPPP AND AZPDES PERMIT 3) POST A COPY OF YOUR NOI AT ENTRANCE TO THE SITE 4) PERFORM AND DOCUMENT YOUR STORM WATER SELF INSPECTIONS 5) CALL FOR INSPECTION PRIOR TO COVERING STORM PIPE INSTALL 6) PROVIDE AN APPROVED PLAN THAT ACCURATELY REFLECTS WHAT WILL BE CONSTRUCTED. |