Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
11/21/2017
Applicant:
Description:
SITE - Tucson Electric Power. Recip gas generator, 138kV and 46kV substations.

Permit Reviews

Permit Number - DP17-0276
Permit Status: Complete
Permit Description: SITE - Tucson Electric Power. Recip gas generator, 138kV and 46kV substations.
Start Date Submittal Complete Date Status  
04/26/2018 DEV PKG - RESUBMITTAL 09/10/2019 COMPLETED Review Details
05/07/2021 DEV PKG - OK TO SUBMIT 05/19/2021 COMPLETED Review Details
05/19/2021 REVISION - - 1ST 06/04/2021 COMPLETED Review Details
11/21/2017 DEV PKG - OK TO SUBMIT 11/21/2017 COMPLETED Review Details
11/21/2017 DEV PKG 04/26/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0276
Permit Description: SITE - Tucson Electric Power. Recip gas generator, 138kV and 46kV substations.
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/11/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.}
08/11/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.}
08/11/2020 SITE - Stormwater Follow-up Passed {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.} ; {Activity date: 12/12/2019; Status: Not ready for Inspection; Inspector: DROBERT5; Comment: Entered by DROBERT5 - THIS SITE WAS INSPECTED ON 12/12/19 FOR THE FIRST TIME SINCE THIS PROJECT HAS BEGUN. RON AND I WALKED THROUGH T5HE SITE AND FOUND THE FOLLOWING DIFFENCIES THAT WILL NEED TO BE ADDRESSED PRIOR TO THE CLOSURE OF THE PROJECT. THESE ARE NOT TO BE CONSIDERED THE ONLY ITEMS THAT NEED TO BE ADDRESSED PRIOR TO THE CLOSURE OF THIS PROJECT, THESE ARE ONLY ITEMS NOTED DURING THE BRIEF WALKING OF THE SITE.
1) CONSTRUCT THE SITE DRAINAGE AS SHOWN ON THE APPROVED PLANS PRIOR TO REQUESTING THE FINAL. SOME OF THE DRAINAGE WORK HAS NOT BEEN COMPLETED IN THE AREAS THE CONSTRUCTIONS TRAILERS THAT ARE CURRENTLY SETTING AT THE SOUTH WEST QUADRANT.
2) COMPLETE ALL ROADWAYS BY INSTALLING ALL THE ASPHALT THROUGHOUT THE SITE THAT IS NOT CONSTRUCTED AT THIS TIME. THIS ROADWAY IS PART OF THE REQUIREMENTS FOR THE FIRE DEPARTMENT TO ALLOW ACCESS INTO THE BUILDINGS. IF THE C OF O IS TO BE NEEDED PRIOR TO THE COMPLETION OF THE ROADWAY THIS WILL NEED TO BE DISCUSSED BY ZONING, ENGINEERING, FIRE, AND THE BUILDING OFFICIAL.
++++++++++++++++++++++++++++++++++




















































































}
08/11/2020 ENGR Grading Final Passed {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.}
08/11/2020 SITE - Stormwater Final Inspection Passed {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.}
08/11/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.}
08/11/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.}
08/11/2020 COT - ENGR - Signage Final Passed {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.}
11/18/2021 ENGR Engineering Final Passed {Activity date: 11/18/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/06/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - PARTIAL AT THIS TIME PENDING THE FOLLOWING ISSUES THAT NEED TO BE ADDRESSED 1) PROVIDE APPROVED REVISED DRAWINGS FOR ALL THE CHANGES THAT HAVE BEEN MADE FOR THE FINAL INSPECTION. 2) PROVIDE THIS DEPARTMENT WITH THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY NOTICE OF TERMINATION LETTER FOR THIS PERMIT.

} ; {Activity date: 04/07/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 09/11/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Provide revisions for all changes to approve plans including pipe installed on north east side of site and redirecting basin. Provide stabilization to all disturbed areas during construction. Provide certification from engineer of record so all grading and drainage all piping and head walls any concrete work that required rebar.Walk site with Jason Dave Roberts went over corrections that need to be made before final project.} ; {Activity date: 08/11/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Provide certification letter from engineer of record for all grading and drainage has been installed per approved plans. Per conversation with Jason and Don from Ashton construction. Note all rebar and installation of stormwater piping on site with out inspection has been installed properly Per Approve plan added in letter also.Complete all work on approve plans. Clean all stormwater piping of sediment and debris as well as riprap. Walk site withWent over work to complete for final in addition.}

Documents

File Name Document Type  
ONLINE SUBMITTAL PAGE SENT WITH ADEQ, 12.20.21.PDF DOCUMENTS VIEW
AZ DEPT OF ENVIRON QUALITY, NOI- EXPIRED.PDF DOCUMENTS VIEW