Permit: DP17-0276
Permit Details
Apply Date:
11/21/2017
Applicant:
Description:
SITE - Tucson Electric Power. Recip gas generator, 138kV and 46kV substations.
Permit Reviews
Permit Number - DP17-0276
Permit Status: Complete
Permit Description: SITE - Tucson Electric Power. Recip gas generator, 138kV and 46kV substations.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/26/2018 | DEV PKG - RESUBMITTAL | 09/10/2019 | COMPLETED |
05/07/2021 | DEV PKG - OK TO SUBMIT | 05/19/2021 | COMPLETED |
05/19/2021 | REVISION - - 1ST | 06/04/2021 | COMPLETED |
11/21/2017 | DEV PKG - OK TO SUBMIT | 11/21/2017 | COMPLETED |
11/21/2017 | DEV PKG | 04/26/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0276
Permit Description: SITE - Tucson Electric Power. Recip gas generator, 138kV and 46kV substations.
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/11/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.} | |
08/11/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.} | |
08/11/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.} ; {Activity date: 12/12/2019; Status: Not ready for Inspection; Inspector: DROBERT5; Comment: Entered by DROBERT5 - THIS SITE WAS INSPECTED ON 12/12/19 FOR THE FIRST TIME SINCE THIS PROJECT HAS BEGUN. RON AND I WALKED THROUGH T5HE SITE AND FOUND THE FOLLOWING DIFFENCIES THAT WILL NEED TO BE ADDRESSED PRIOR TO THE CLOSURE OF THE PROJECT. THESE ARE NOT TO BE CONSIDERED THE ONLY ITEMS THAT NEED TO BE ADDRESSED PRIOR TO THE CLOSURE OF THIS PROJECT, THESE ARE ONLY ITEMS NOTED DURING THE BRIEF WALKING OF THE SITE. 1) CONSTRUCT THE SITE DRAINAGE AS SHOWN ON THE APPROVED PLANS PRIOR TO REQUESTING THE FINAL. SOME OF THE DRAINAGE WORK HAS NOT BEEN COMPLETED IN THE AREAS THE CONSTRUCTIONS TRAILERS THAT ARE CURRENTLY SETTING AT THE SOUTH WEST QUADRANT. 2) COMPLETE ALL ROADWAYS BY INSTALLING ALL THE ASPHALT THROUGHOUT THE SITE THAT IS NOT CONSTRUCTED AT THIS TIME. THIS ROADWAY IS PART OF THE REQUIREMENTS FOR THE FIRE DEPARTMENT TO ALLOW ACCESS INTO THE BUILDINGS. IF THE C OF O IS TO BE NEEDED PRIOR TO THE COMPLETION OF THE ROADWAY THIS WILL NEED TO BE DISCUSSED BY ZONING, ENGINEERING, FIRE, AND THE BUILDING OFFICIAL. ++++++++++++++++++++++++++++++++++ } |
|
08/11/2020 | ENGR Grading Final | Passed | {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.} | |
08/11/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.} | |
08/11/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.} | |
08/11/2020 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.} | |
08/11/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - approved.} | |
11/18/2021 | ENGR Engineering Final | Passed | {Activity date: 11/18/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/06/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - PARTIAL AT THIS TIME PENDING THE FOLLOWING ISSUES THAT NEED TO BE ADDRESSED 1) PROVIDE APPROVED REVISED DRAWINGS FOR ALL THE CHANGES THAT HAVE BEEN MADE FOR THE FINAL INSPECTION. 2) PROVIDE THIS DEPARTMENT WITH THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY NOTICE OF TERMINATION LETTER FOR THIS PERMIT. } ; {Activity date: 04/07/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 09/11/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Provide revisions for all changes to approve plans including pipe installed on north east side of site and redirecting basin. Provide stabilization to all disturbed areas during construction. Provide certification from engineer of record so all grading and drainage all piping and head walls any concrete work that required rebar.Walk site with Jason Dave Roberts went over corrections that need to be made before final project.} ; {Activity date: 08/11/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Provide certification letter from engineer of record for all grading and drainage has been installed per approved plans. Per conversation with Jason and Don from Ashton construction. Note all rebar and installation of stormwater piping on site with out inspection has been installed properly Per Approve plan added in letter also.Complete all work on approve plans. Clean all stormwater piping of sediment and debris as well as riprap. Walk site withWent over work to complete for final in addition.} |