Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP17-0276
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/11/2020 | SITE - Stormwater Follow-up | RLEDONNE | Approved | Entered by JSCHNEI2 - approved. |
12/12/2019 | SITE - Stormwater Follow-up | DROBERT5 | Not ready for Inspection | Entered by DROBERT5 - THIS SITE WAS INSPECTED ON 12/12/19 FOR THE FIRST TIME SINCE THIS PROJECT HAS BEGUN. RON AND I WALKED THROUGH T5HE SITE AND FOUND THE FOLLOWING DIFFENCIES THAT WILL NEED TO BE ADDRESSED PRIOR TO THE CLOSURE OF THE PROJECT. THESE ARE NOT TO BE CONSIDERED THE ONLY ITEMS THAT NEED TO BE ADDRESSED PRIOR TO THE CLOSURE OF THIS PROJECT, THESE ARE ONLY ITEMS NOTED DURING THE BRIEF WALKING OF THE SITE. 1) CONSTRUCT THE SITE DRAINAGE AS SHOWN ON THE APPROVED PLANS PRIOR TO REQUESTING THE FINAL. SOME OF THE DRAINAGE WORK HAS NOT BEEN COMPLETED IN THE AREAS THE CONSTRUCTIONS TRAILERS THAT ARE CURRENTLY SETTING AT THE SOUTH WEST QUADRANT. 2) COMPLETE ALL ROADWAYS BY INSTALLING ALL THE ASPHALT THROUGHOUT THE SITE THAT IS NOT CONSTRUCTED AT THIS TIME. THIS ROADWAY IS PART OF THE REQUIREMENTS FOR THE FIRE DEPARTMENT TO ALLOW ACCESS INTO THE BUILDINGS. IF THE C OF O IS TO BE NEEDED PRIOR TO THE COMPLETION OF THE ROADWAY THIS WILL NEED TO BE DISCUSSED BY ZONING, ENGINEERING, FIRE, AND THE BUILDING OFFICIAL. ++++++++++++++++++++++++++++++++++ |