Permit Details

Status:
Complete
Type:
Development Package
Address:
348 E ELVADO RD
Address NEW:
348 E ELVADO RD
Apply Date:
11/21/2017
Applicant:
Lisa Bowers
Description:
SITE

Permit Reviews

Permit Number - DP17-0275
Permit Status: Complete
Permit Description: SITE
Start Date Submittal Complete Date Status  
01/23/2018 RESUB - SITE/GRADING ALL 02/28/2018 COMPLETED Review Details
02/28/2018 RESUB - SITE/GRADING ALL 03/02/2018 COMPLETED Review Details
03/02/2018 RESUB - SITE/GRADING ALL 03/05/2018 ACTIVE Review Details
11/21/2017 DEV PKG - OK TO SUBMIT 11/21/2017 COMPLETED Review Details
11/21/2017 SITE and/or GRADING 01/08/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0275
Permit Description: SITE
Total Completed Inspections - 9
Date Description Inspector Results Comments
03/09/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 03/09/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CONTRACTOR HAS BEEN ADVISED TO MONITOR THE STREETS TO PREVENT ANY TRACKOUT PROBLEMS. HE WILL CONTINUE TO SCHEDULE THIS INSPECTION EVERY 2 TO 3 WEEKS AS NEEDED.}
11/01/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 11/01/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - }
11/01/2018 SITE - Stormwater Follow-up Passed {Activity date: 11/01/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - }
11/01/2018 ENGR Grading Final Passed {Activity date: 11/01/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 08/28/2018; Status: Partial Approval; Inspector: BBENEDO1; Comment: Entered by BBENEDO1 - IVRS - Inspection :*Pre grout for trash enclosure} ; {Activity date: 08/22/2018; Status: Partial Approval; Inspector: MHASSAN; Comment: Entered by VFLORES1 - First course okay for pre grout.}
11/01/2018 SITE - Stormwater Final Inspection Passed {Activity date: 11/01/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - }
11/01/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 11/01/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - }
11/01/2018 COT - ENGR - Signage Final Passed {Activity date: 11/01/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - see final inspection notes}
11/29/2018 ENGR Engineering Final Passed {Activity date: 11/29/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 11/01/2018; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - provide a revision for the missing water harvesting basin and missing trees due to underground utilities. Install van accessible sign, drill holes for and install pegs for the trash enclosure doors, provide stainless steel wire ties at tree pole supports.}
12/04/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 12/04/2018; Status: Approved; Inspector: ACONNOR; Comment: Entered by ACONNOR1 - }

Documents

File Name Document Type  
LOC - DP17-0275.PDF LETTER OF COMPLETION VIEW
001_COVER SHEET / PROJECT LAYOUT_C1.TIF DEVELOPMENT PACKAGE VIEW
002_DEVELOPMENT_C2.TIF DEVELOPMENT PACKAGE VIEW
003_HYDROLOGY / GRADING_C3.TIF DEVELOPMENT PACKAGE VIEW
004_DETAILS_C4.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING PROFILES_C5.TIF DEVELOPMENT PACKAGE VIEW
006_UTILITY_C6.TIF DEVELOPMENT PACKAGE VIEW
007_LANDSCAPE_L1.TIF DEVELOPMENT PACKAGE VIEW
008_IRRIGATION_L2.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW