Permit: DP17-0275
Permit Details
Apply Date:
11/21/2017
Applicant:
Lisa Bowers
Description:
SITE
Permit Reviews
Permit Number - DP17-0275
Permit Status: Complete
Permit Description: SITE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/23/2018 | RESUB - SITE/GRADING ALL | 02/28/2018 | COMPLETED |
| 02/28/2018 | RESUB - SITE/GRADING ALL | 03/02/2018 | COMPLETED |
| 03/02/2018 | RESUB - SITE/GRADING ALL | 03/05/2018 | ACTIVE |
| 11/21/2017 | DEV PKG - OK TO SUBMIT | 11/21/2017 | COMPLETED |
| 11/21/2017 | SITE and/or GRADING | 01/08/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0275
Permit Description: SITE
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/09/2018 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 03/09/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CONTRACTOR HAS BEEN ADVISED TO MONITOR THE STREETS TO PREVENT ANY TRACKOUT PROBLEMS. HE WILL CONTINUE TO SCHEDULE THIS INSPECTION EVERY 2 TO 3 WEEKS AS NEEDED.} | |
| 11/01/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 11/01/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } | |
| 11/01/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 11/01/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } | |
| 11/01/2018 | ENGR Grading Final | Passed | {Activity date: 11/01/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 08/28/2018; Status: Partial Approval; Inspector: BBENEDO1; Comment: Entered by BBENEDO1 - IVRS - Inspection :*Pre grout for trash enclosure} ; {Activity date: 08/22/2018; Status: Partial Approval; Inspector: MHASSAN; Comment: Entered by VFLORES1 - First course okay for pre grout.} | |
| 11/01/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 11/01/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } | |
| 11/01/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 11/01/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } | |
| 11/01/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 11/01/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - see final inspection notes} | |
| 11/29/2018 | ENGR Engineering Final | Passed | {Activity date: 11/29/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 11/01/2018; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - provide a revision for the missing water harvesting basin and missing trees due to underground utilities. Install van accessible sign, drill holes for and install pegs for the trash enclosure doors, provide stainless steel wire ties at tree pole supports.} | |
| 12/04/2018 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 12/04/2018; Status: Approved; Inspector: ACONNOR; Comment: Entered by ACONNOR1 - } |