Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
315 N PARK AV
Apply Date:
11/17/2017
Applicant:
Description:
SITE/GRADE/SWPPP - MULTIFAMILY

Permit Reviews

Permit Number - DP17-0272
Permit Status: Complete
Permit Description: SITE/GRADE/SWPPP - MULTIFAMILY
Start Date Submittal Complete Date Status  
01/31/2018 RESUB - SITE and/or GRADING 02/20/2019 COMPLETED Review Details
02/20/2019 REVISION - SITE 02/20/2019 COMPLETED Review Details
11/17/2017 DEV PKG - OK TO SUBMIT 11/17/2017 COMPLETED Review Details
11/17/2017 SITE and/or GRADING 01/31/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0272
Permit Description: SITE/GRADE/SWPPP - MULTIFAMILY
Total Completed Inspections - 9
Date Description Inspector Results Comments
02/28/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/28/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 -
JAMIE - 360-2100

1) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP IS REQUIRED, HOWEVER CONTRACTOR MUST KEEP SOIL ON SITE DURING CONSTRUCTION WITHIN THE CITY OF TUCSON.
2) CALL FOR INSPECTION FOR ANY CHANGES OR CONCERNS TO THE SITE/GRADING/LANDSCAPING PLANS
3) CALL FOR INSPECTION FOR UNDERGROUND STORM PIPE OR TRASH ENCLOSURE FOOTINGS INSTALL
4) CALL FOR INSPECTIO PRIOR TO FINAL INSPECTION FOR A PRE-FINAL WALK THROUGH} ; {Activity date: 02/27/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONTACT, LEFT MESSAGE}
03/13/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 03/13/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - }
03/13/2019 COT - ENGR - Signage Final Passed {Activity date: 03/13/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - }
03/15/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 03/15/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
03/15/2019 ENGR Engineering Final Passed {Activity date: 03/15/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/13/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Dave from building excellence. Complete riprap as required note detail calls for 6 inches times two. Stake the trees as shown on the detail, Remove nursery steaks. Provide clarification on bicycle parking, whether a concrete slab is required or only footings. See detail page 5 which appears to show a concrete slab but does not specify it in writing. Provide inspection history for trashing closure or provide a letter from the engineer specifying the trashing closure was built this city of Tucson Standard detail 6.01
Provide a letter from the engineer certifying grade for the site}
03/15/2019 SITE - Stormwater Follow-up Passed {Activity date: 03/15/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
03/15/2019 ENGR Grading Final Passed {Activity date: 03/15/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
03/15/2019 SITE - Stormwater Final Inspection Passed {Activity date: 03/15/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
03/15/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 03/15/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
None LETTER OF COMPLETION VIEW
001_COVER SHEET_C-1.TIF DEVELOPMENT PACKAGE VIEW
002_SITE_C-2.TIF DEVELOPMENT PACKAGE VIEW
003_GRADING / DRAINAGE_C-3.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / DETAILS_C-4.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING / DETAILS_C-5.TIF DEVELOPMENT PACKAGE VIEW
006_PRIVATE SEWER_C-6.TIF DEVELOPMENT PACKAGE VIEW
007_PRAVATE WATER_C-7.TIF DEVELOPMENT PACKAGE VIEW
008_HORIZONTAL CONTROL_C-8.TIF DEVELOPMENT PACKAGE VIEW
009_LANDSCAPE COVER_L-1.TIF DEVELOPMENT PACKAGE VIEW
010_LANDSCAPE NOTES / SCHEDULEL_L-2.TIF DEVELOPMENT PACKAGE VIEW
011_NPPO_L-3.TIF DEVELOPMENT PACKAGE VIEW
012_LANDSCAPE_L-4.TIF DEVELOPMENT PACKAGE VIEW
013_IRRIGATION_L-5.TIF DEVELOPMENT PACKAGE VIEW
014_LANDSCAPE DETAILS_L-6.TIF DEVELOPMENT PACKAGE VIEW
015_LANDSCAPE DETIALS_L-7.TIF DEVELOPMENT PACKAGE VIEW
016_LANDSCAPE / IRRIGATION DETAILS_L-8.TIF DEVELOPMENT PACKAGE VIEW
017_IRRIGATION DETAILS_L-9.TIF DEVELOPMENT PACKAGE VIEW
018_ENVIROMENTAL RESOURCE REPORT_L-10.TIF DEVELOPMENT PACKAGE VIEW
019_ALTA_1 OF 1.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW