Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/31/2018 | RESUB - SITE and/or GRADING | 02/20/2019 | COMPLETED |
02/20/2019 | REVISION - SITE | 02/20/2019 | COMPLETED |
11/17/2017 | DEV PKG - OK TO SUBMIT | 11/17/2017 | COMPLETED |
11/17/2017 | SITE and/or GRADING | 01/31/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0272
Permit Description: SITE/GRADE/SWPPP - MULTIFAMILY
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/28/2018 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 02/28/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - JAMIE - 360-2100 1) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP IS REQUIRED, HOWEVER CONTRACTOR MUST KEEP SOIL ON SITE DURING CONSTRUCTION WITHIN THE CITY OF TUCSON. 2) CALL FOR INSPECTION FOR ANY CHANGES OR CONCERNS TO THE SITE/GRADING/LANDSCAPING PLANS 3) CALL FOR INSPECTION FOR UNDERGROUND STORM PIPE OR TRASH ENCLOSURE FOOTINGS INSTALL 4) CALL FOR INSPECTIO PRIOR TO FINAL INSPECTION FOR A PRE-FINAL WALK THROUGH} ; {Activity date: 02/27/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONTACT, LEFT MESSAGE} |
|
03/13/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 03/13/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } | |
03/13/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 03/13/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } | |
03/15/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 03/15/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
03/15/2019 | ENGR Engineering Final | Passed | {Activity date: 03/15/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/13/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Dave from building excellence. Complete riprap as required note detail calls for 6 inches times two. Stake the trees as shown on the detail, Remove nursery steaks. Provide clarification on bicycle parking, whether a concrete slab is required or only footings. See detail page 5 which appears to show a concrete slab but does not specify it in writing. Provide inspection history for trashing closure or provide a letter from the engineer specifying the trashing closure was built this city of Tucson Standard detail 6.01 Provide a letter from the engineer certifying grade for the site} |
|
03/15/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 03/15/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
03/15/2019 | ENGR Grading Final | Passed | {Activity date: 03/15/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
03/15/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 03/15/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |