Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/28/2018 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 -
JAMIE - 360-2100
1) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP IS REQUIRED, HOWEVER CONTRACTOR MUST KEEP SOIL ON SITE DURING CONSTRUCTION WITHIN THE CITY OF TUCSON.
2) CALL FOR INSPECTION FOR ANY CHANGES OR CONCERNS TO THE SITE/GRADING/LANDSCAPING PLANS
3) CALL FOR INSPECTION FOR UNDERGROUND STORM PIPE OR TRASH ENCLOSURE FOOTINGS INSTALL
4) CALL FOR INSPECTIO PRIOR TO FINAL INSPECTION FOR A PRE-FINAL WALK THROUGH |
| 02/27/2018 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by DROBERT5 - NO CONTACT, LEFT MESSAGE |