Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
7440 S WILMOT RD
Address NEW:
7440 S WILMOT RD
Apply Date:
08/31/2017
Applicant:
Jeffrey Stanley
Description:
TENT PLAT - SW WILMOT/LOS REALES

Permit Reviews

Permit Number - DP17-0213
Permit Status: Complete
Permit Description: TENT PLAT - SW WILMOT/LOS REALES
Start Date Submittal Complete Date Status  
08/31/2017 DEV PKG - OK TO SUBMIT 09/01/2017 COMPLETED Review Details
09/01/2017 TENTATIVE PLAT REVIEW 10/03/2017 COMPLETED Review Details
10/26/2017 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 12/13/2017 COMPLETED Review Details
12/13/2017 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 12/22/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0213
Permit Description: TENT PLAT - SW WILMOT/LOS REALES
Total Completed Inspections - 9
Date Description Inspector Results Comments
06/08/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 06/08/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
06/08/2018 ENGR Grading Final Passed {Activity date: 06/08/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
06/08/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 06/08/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
06/08/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 06/08/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
06/08/2018 COT - ENGR - Signage Final Passed {Activity date: 06/08/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
06/15/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/15/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by SVALENZ1 - APPROVAL SENT TO RECORDS} ; {Activity date: 06/08/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE FOLLOWING ITEMS ARE NOT COMPLETED PER THE APPROVED PLANS AND WILL NEED ADDITIONAL WORK:
1) THE NORTHERN HANDICAP PARKING SPACE LOCATED ON THIS SITE IS OUTSIDE THE MAXIMUM COMPLAINCE FOR THE SLOPES. THE CONTRACTOR WILL BE WORKING ON MAKING THE NECESSARY CHANGES TO BRING IT BACK INTO COMPLIANCE PRIOR TO CALLING IN FOR RE INSPECTION.
2) ALSO THE RAMP COMING IN FROM WILMOT EXCEEDS THE MAXIMUM SLOPE ON THE SIDEWALK AND MAY REQUIRE THAT HANDRAIL BE PLACED ALONG THE OUTER EDGES OF THE RAMP ACCORDING TO ICC A117.1-2009 SECTION 405.8 HANDRAILS. I WILL DISCUSS THE OPTIONS WITH THE BUILDING OFFICIAL PRIOR TO MAKING THIS DETERMINATION.
3) COMPLETE THE TRASH ENCLOSURE TO BRING IT O THE PROPER HEIGHT OF 5.5 FEET ABOVE THE FINISH SLAB.
4) COMPLETE ALL OF THE PLACEMENT OF THE LANDSCAPING MATERIALS THROUGHOUT THIS SITE.}
06/15/2018 ENGR Engineering Final Passed {Activity date: 06/15/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by SVALENZ1 - APPROVAL SENT TO RECORDS} ; {Activity date: 06/08/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE FOLLOWING ITEMS ARE NOT COMPLETED PER THE APPROVED PLANS AND WILL NEED ADDITIONAL WORK:
1) THE NORTHERN HANDICAP PARKING SPACE LOCATED ON THIS SITE IS OUTSIDE THE MAXIMUM COMPLAINCE FOR THE SLOPES. THE CONTRACTOR WILL BE WORKING ON MAKING THE NECESSARY CHANGES TO BRING IT BACK INTO COMPLIANCE PRIOR TO CALLING IN FOR RE INSPECTION.
2) ALSO THE RAMP COMING IN FROM WILMOT EXCEEDS THE MAXIMUM SLOPE ON THE SIDEWALK AND MAY REQUIRE THAT HANDRAIL BE PLACED ALONG THE OUTER EDGES OF THE RAMP ACCORDING TO ICC A117.1-2009 SECTION 405.8 HANDRAILS. I WILL DISCUSS THE OPTIONS WITH THE BUILDING OFFICIAL PRIOR TO MAKING THIS DETERMINATION.
3) COMPLETE THE TRASH ENCLOSURE TO BRING IT O THE PROPER HEIGHT OF 5.5 FEET ABOVE THE FINISH SLAB.
4) COMPLETE ALL OF THE PLACEMENT OF THE LANDSCAPING MATERIALS THROUGHOUT THIS SITE.}
06/15/2018 SITE - Stormwater Follow-up Passed {Activity date: 06/15/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by SVALENZ1 - }
06/15/2018 SITE - Stormwater Final Inspection Passed {Activity date: 06/15/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by SVALENZ1 - }

Documents

File Name Document Type  
001_COVER SHEET_1 OF 11.TIF DEVELOPMENT PACKAGE VIEW
002_TENTATIVE PLAT_2 OF 11.TIF DEVELOPMENT PACKAGE VIEW
003_DEVELOPMENT_3 OF 11.TIF DEVELOPMENT PACKAGE VIEW
004_PRIVATE PAVING / GRADING_4 OF 11.TIF DEVELOPMENT PACKAGE VIEW
005_DETAIL_5 OF 11.TIF DEVELOPMENT PACKAGE VIEW
006_NPPO_6 OF 11.TIF DEVELOPMENT PACKAGE VIEW
007_LANDSCAPE_7 OF 11.TIF DEVELOPMENT PACKAGE VIEW
008_IRRIGATION_8 OF 11.TIF DEVELOPMENT PACKAGE VIEW
009_LANDSCAPE DETAILS_9 OF 11.TIF DEVELOPMENT PACKAGE VIEW
010_WATER HARVESTING_10 OF 11.TIF DEVELOPMENT PACKAGE VIEW
011_SWPPP_11 OF 11.TIF DEVELOPMENT PACKAGE VIEW
1_DP17-0213_ADDRESSING.PDF DOCUMENTS VIEW
SWPPP - FIRST HALF.PDF DOCUMENTS VIEW
SWPPP SECOND HALF - SECTIONS 16, 17, AND 18.PDF DOCUMENTS VIEW
SWPPP CONTRACTOR CERTIFICATION SIGNED.PDF DOCUMENTS VIEW
SWPPP OWNER CERTIFICATION SIGNED.PDF DOCUMENTS VIEW
SWPPP PLAN SHEET.PDF DOCUMENTS VIEW
SWPPP NOI APPLICATION SIGNED.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
RESPONSE LETTER FOR 2ND SUBMITTAL.PDF DOCUMENTS VIEW
RESPONSE LETTER FOR 3RD SUBMITTAL.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW