Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
Permit Number - DP17-0213
Inspection Description - PDSD Site/Engineering Division - Landscaping
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/08/2018 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Approved | Entered by DROBERT5 - |
| 06/08/2018 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Not ready for Inspection | Entered by DROBERT5 - THE FOLLOWING ITEMS ARE NOT COMPLETED PER THE APPROVED PLANS AND WILL NEED ADDITIONAL WORK: 1) THE NORTHERN HANDICAP PARKING SPACE LOCATED ON THIS SITE IS OUTSIDE THE MAXIMUM COMPLAINCE FOR THE SLOPES. THE CONTRACTOR WILL BE WORKING ON MAKING THE NECESSARY CHANGES TO BRING IT BACK INTO COMPLIANCE PRIOR TO CALLING IN FOR RE INSPECTION. 2) ALSO THE RAMP COMING IN FROM WILMOT EXCEEDS THE MAXIMUM SLOPE ON THE SIDEWALK AND MAY REQUIRE THAT HANDRAIL BE PLACED ALONG THE OUTER EDGES OF THE RAMP ACCORDING TO ICC A117.1-2009 SECTION 405.8 HANDRAILS. I WILL DISCUSS THE OPTIONS WITH THE BUILDING OFFICIAL PRIOR TO MAKING THIS DETERMINATION. 3) COMPLETE THE TRASH ENCLOSURE TO BRING IT O THE PROPER HEIGHT OF 5.5 FEET ABOVE THE FINISH SLAB. 4) COMPLETE ALL OF THE PLACEMENT OF THE LANDSCAPING MATERIALS THROUGHOUT THIS SITE. |
| 06/15/2018 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Approved | Entered by SVALENZ1 - APPROVAL SENT TO RECORDS |
| 06/08/2018 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Not ready for Inspection | Entered by DROBERT5 - THE FOLLOWING ITEMS ARE NOT COMPLETED PER THE APPROVED PLANS AND WILL NEED ADDITIONAL WORK: 1) THE NORTHERN HANDICAP PARKING SPACE LOCATED ON THIS SITE IS OUTSIDE THE MAXIMUM COMPLAINCE FOR THE SLOPES. THE CONTRACTOR WILL BE WORKING ON MAKING THE NECESSARY CHANGES TO BRING IT BACK INTO COMPLIANCE PRIOR TO CALLING IN FOR RE INSPECTION. 2) ALSO THE RAMP COMING IN FROM WILMOT EXCEEDS THE MAXIMUM SLOPE ON THE SIDEWALK AND MAY REQUIRE THAT HANDRAIL BE PLACED ALONG THE OUTER EDGES OF THE RAMP ACCORDING TO ICC A117.1-2009 SECTION 405.8 HANDRAILS. I WILL DISCUSS THE OPTIONS WITH THE BUILDING OFFICIAL PRIOR TO MAKING THIS DETERMINATION. 3) COMPLETE THE TRASH ENCLOSURE TO BRING IT O THE PROPER HEIGHT OF 5.5 FEET ABOVE THE FINISH SLAB. 4) COMPLETE ALL OF THE PLACEMENT OF THE LANDSCAPING MATERIALS THROUGHOUT THIS SITE. |