Permit: DP17-0174
Permit Details
Apply Date:
07/17/2017
Applicant:
Lisa Bowers
Description:
SITE/GRADING - ATLAS COPCO EXPANSION PHASES II & IIIOriginal Approval 09/28/2017 (11 pages)1
Permit Reviews
Permit Number - DP17-0174
Permit Status: Complete
Permit Description: SITE/GRADING - ATLAS COPCO EXPANSION PHASES II & IIIOriginal Approval 09/28/2017 (11 pages)1
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/20/2018 | DEV PKG - REVISION | 03/23/2018 | COMPLETED |
07/17/2017 | DEV PKG - OK TO SUBMIT | 07/18/2017 | COMPLETED |
07/18/2017 | DEV PKG | 09/18/2017 | COMPLETED |
09/18/2017 | DEV PKG - RESUBMITTAL | 09/21/2017 | COMPLETED |
09/21/2017 | DEV PKG - RESUBMITTAL | 10/04/2017 | COMPLETED |
11/09/2017 | DEV PKG - REVISION | 11/13/2017 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0174
Permit Description: SITE/GRADING - ATLAS COPCO EXPANSION PHASES II & IIIOriginal Approval 09/28/2017 (11 pages)1
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/18/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 10/18/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET ON SITE WITH GC WENT OVER AP PLANS.} | |
01/17/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 01/17/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
01/17/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 01/17/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
03/26/2018 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 03/26/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
03/26/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 03/26/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 01/17/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME. NO TRACKOUT NOTED ON ANY OF THE ADJACENT STREETS} ; {Activity date: 12/21/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} | |
03/26/2018 | ENGR Grading Final | Passed | {Activity date: 03/26/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
03/26/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 03/26/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
03/26/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 03/26/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
04/02/2018 | ENGR Engineering Final | Passed | {Activity date: 04/02/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by KROBLES1 - PER PHONE CONVERSATION} ; {Activity date: 01/26/2018; Status: Correction Required; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER SIDEWALKS AND ADA PARKING AREAS .AND RAMPS.} ; {Activity date: 01/23/2018; Status: Correction Required; Inspector: DROBERT5; Comment: Entered by DROBERT5 - THE REMAINING WORK ON THIS SITE AT THIS TIME IS CONTAINED WITHIN THE PARAMETERS OF THE DEVLOPMENT PACKAGE DP17-0174. THE WORK THAT IS NEEDED FOR THE ADA ACCESS INTO THE MAIN BUILDING HAS NOT YET BEEN DECIDED AT THIS TIME. THE ENGINEER OF RECORD WILL ADVISE US ONCE THERE IS A SOLUTION FOR THIS SITE AND THEY WILL BE RESUBMITTING THE PLANS FOR THEIR REVISIONS} ; {Activity date: 01/10/2018; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS BEFORE CALLING FOR FINAL.} |