Permit: DP17-0130
Permit Details
Apply Date:
06/09/2017
Applicant:
Tri Miller
Description:
NEW PARKING SERVING EXISTING CHAMBERLAIN FACILITYOriginal Approval 10/24/2017 (20 pages)1st Re
Permit Reviews
Permit Number - DP17-0130
Permit Status: Complete
Permit Description: NEW PARKING SERVING EXISTING CHAMBERLAIN FACILITYOriginal Approval 10/24/2017 (20 pages)1st Re
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/09/2017 | DEV PKG - OK TO SUBMIT | 06/09/2017 | COMPLETED |
06/09/2017 | DEV PKG | 07/13/2017 | COMPLETED |
08/08/2017 | DEV PKG - RESUBMITTAL | 10/25/2017 | COMPLETED |
12/15/2017 | DEV PKG - REVISION | 12/22/2017 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0130
Permit Description: NEW PARKING SERVING EXISTING CHAMBERLAIN FACILITYOriginal Approval 10/24/2017 (20 pages)1st Re
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/27/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 11/27/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ON SITE.} ; {Activity date: 11/22/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GC NOT ON SITE.} | |
02/16/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 02/16/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
02/16/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 02/16/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
03/02/2018 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 03/02/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/16/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE AS SHOWN ON THE APPROVED PLANS, THIS WILL INCLUDE ALL STAKING OF THE TREES, INSTALLATION OF THE HYDROSEEDING} | |
03/02/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 03/02/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/16/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, NO TRACKOUT NOTED ON THE LOCAL STREETS} ; {Activity date: 02/01/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/29/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} | |
03/02/2018 | ENGR Grading Final | Passed | {Activity date: 03/02/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/16/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
03/02/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 03/02/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
03/02/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 03/02/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 11/21/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SOME OF THE CONTROLS HAVE BEEN INSTALLED PRIOR TO THIS DATE, VERIFICATION OF WHAT HAS BEEN INSTALLED WILL BE DONE TOMORROW DURING THE PRE-CONSTRUCTION MEETING.} | |
03/15/2018 | ENGR Engineering Final | Passed | {Activity date: 03/15/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 03/02/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE PLACEMENT OF THE HYDROSEED IN THE REMAINING DISTURBED AREAS, AND PERFORM MINOC CLEANUP AROUND THE SITE BEFORE YOU SCHEDULE THE FINAL GRADING INSPECTION FOR THIS SITE.} |