Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP17-0103
Permit Details
Apply Date:
04/28/2017
Applicant:
Peter Salonga
Description:
TENTATIVE PLAT/FLD - STONE LANE HOMES LOTS 1-12
Permit Reviews
Permit Number - DP17-0103
Permit Status: Issued
Permit Description: TENTATIVE PLAT/FLD - STONE LANE HOMES LOTS 1-12
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/28/2017 | DEV PKG - OK TO SUBMIT | 04/28/2017 | COMPLETED |
| 04/28/2017 | TENTATIVE PLAT REVIEW | 06/08/2017 | COMPLETED |
| 06/29/2017 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 08/04/2017 | COMPLETED |
| 09/11/2017 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 11/13/2017 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP17-0103
Permite Description: TENTATIVE PLAT/FLD - STONE LANE HOMES LOTS 1-12
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2019 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | {Activity date: 02/27/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - No controls were ever installed.} ; {Activity date: 11/29/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Provide track out protection then recall for inspection} |
| 02/27/2019 | COT - ENGR - Signage Final | N/A | Canceled | {Activity date: 02/27/2019; Status: Not Applicable; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is no accessible parking specified.} |
| 07/24/2020 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 07/24/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No issues with track out. Site drains towards basin. There are materials piled in the roadway but this is a private street.} ; {Activity date: 07/06/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 05/21/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time.} ; {Activity date: 04/04/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no issues at this time.} ; {Activity date: 02/27/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - No concerns at this time. This site drains toward the north west corner of the property and into the basin.} |
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
| 10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
| 10/27/2022 | ENGR Grading Final | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
| 10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
| 10/26/2022 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready |