Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 07/24/2020 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by JSCHNEI2 - Continued. No issues with track out. Site drains towards basin. There are materials piled in the roadway but this is a private street. |
| 07/06/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by JSCHNEI2 - Continue. No concerns at this time. |
| 05/21/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by DMERANZ1 - No issues at this time. |
| 04/04/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - There are no issues at this time. |
| 02/27/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - No concerns at this time. This site drains toward the north west corner of the property and into the basin. |