Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Address:
6133 S ANTRIM LP
Apply Date:
04/28/2017
Applicant:
paul nzomo
Description:
TENTATIVE PLAT/GRADING/SWPPP - DESERT POINT 2 LOTS 1-41

Permit Reviews

Permit Number - DP17-0102
Permit Status: Issued
Permit Description: TENTATIVE PLAT/GRADING/SWPPP - DESERT POINT 2 LOTS 1-41
Start Date Submittal Complete Date Status  
04/03/2019 DEV PKG - REVISION 04/16/2019 COMPLETED Review Details
04/28/2017 DEV PKG - OK TO SUBMIT 04/28/2017 COMPLETED Review Details
04/28/2017 TENTATIVE PLAT REVIEW 09/26/2017 COMPLETED Review Details
05/01/2018 TENTATIVE PLAT REVIEW 06/01/2018 COMPLETED Review Details
06/01/2018 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 04/02/2019 COMPLETED Review Details
10/13/2017 TENTATIVE PLAT REVIEW 12/04/2017 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP17-0102
Permite Description: TENTATIVE PLAT/GRADING/SWPPP - DESERT POINT 2 LOTS 1-41
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
02/03/2021 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 02/03/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE RESCHEDULE WHEN CONTRACTOR ON SITE} ; {Activity date: 12/02/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.

} ; {Activity date: 11/16/2020; Status: Continued; Inspector: RLADONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 11/03/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 10/26/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - 09154 stormwater follow up inspection. Continue. No concerns at this time.} ; {Activity date: 09/23/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.

} ; {Activity date: 09/02/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 08/24/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue.Concrete not being washed out properly left in yards of houses. Repairs need to be made to stormwater controls.} ; {Activity date: 08/07/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 08/04/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 07/16/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Controls need to be replaced at sidewalk scuppers.} ; {Activity date: 08/20/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Protection for sidewalk scuppers in cul-de-sac have not been installed. Bob Mallory said he was going to get some installed soon.} ; {Activity date: 08/13/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is track out on the streets within the subdivision, however the public roads outside of the side entrance are clean} ; {Activity date: 07/25/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Stormwater controls on west side of site next to basin have been removed need to be reinstalled. Concrete washout needs to be installed Met with Russell from KB homes went over corrections.} ; {Activity date: 06/28/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Met with foreman on site for Eagle rock called Bob Mallory About having stormwater book in truck on site at all times. Also about track out on southside of Site. Talk to Lance from KB homes about controls on the east side of site.He said wall was going up next week.} ; {Activity date: 05/21/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 03/06/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/19/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GRADING PM ABOUT TRUCKS GOING ON STREETS IN THE NEIGHBORHOOD.} ; {Activity date: 02/13/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.}
02/03/2021 PDSD Engineering Division Pre-Construction SITE N/A Canceled {Activity date: 02/03/2021; Status: Not Applicable; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - NOT APPLICABLE} ; {Activity date: 01/31/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - I met with Jim with Eaglerock at 310-9245. Not present for the meeting was Lance from KB homes at 975-2730 who is responsible for the SWIPP. And Paul kill Lonzo who is the engineer of record. The swift information is located at the south entrance. Check out protection has been provided by Eagle rock. Perimeter waddle has been installed by KV. All roads are public on this site.} ; {Activity date: 01/24/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Desert pointe subdivision face to east of Alvernon and north of Valencia. Enter through existing subdivision or off of Benson highway. Jim with Eaglerock 310–9245. This is a KB subdivision and KB is handling the SWIPP. Schedule a preconstruction meeting with Eaglerock, KB homes and city engineering inspectors. Please provide plans.}
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: DP17-0102
Permit Description: TENTATIVE PLAT/GRADING/SWPPP - DESERT POINT 2 LOTS 1-41
Total Completed Inspections - 7
Date Description Inspector Results Comments
01/31/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 01/31/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - }
02/19/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 02/19/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - }
02/19/2021 COT - ENGR - Signage Final Passed {Activity date: 02/19/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - }
06/27/2022 SITE - Stormwater Final Inspection Passed {Activity date: 06/27/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED} ; {Activity date: 02/19/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - NEED TO REMOVE WATTLES FROM SCUPPER}
10/11/2023 PDSD Site/Engineering Division - Landscaping Passed Project completed, DP from 2017, no empty lots are left.
10/13/2023 ENGR Engineering Final Passed
10/11/2023 ENGR Grading Final Passed Project completed, DP from 2017, no empty lots are left.

Documents

File Name Document Type  
001_T PLAT COVER SHEET_1 OF 15.TIF DEVELOPMENT PACKAGE VIEW
002_T PLAT PLAN SHEET_2 OF 15.TIF DEVELOPMENT PACKAGE VIEW
003_T PLAT DETAIL SHEET_3 OF 15.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING PLAN COVER SHEET_4 OF 15.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING PLAN SHEET_5 OF 15.TIF DEVELOPMENT PACKAGE VIEW
006_GRADING DETAIL SHEET_6 OF 15.TIF DEVELOPMENT PACKAGE VIEW
007_LANDSCAPE COVER SHEET_L-1.TIF DEVELOPMENT PACKAGE VIEW
008_NPPP_L-2.TIF DEVELOPMENT PACKAGE VIEW
009_LANDSCAPE PLAN_L-3.TIF DEVELOPMENT PACKAGE VIEW
010_IRRIGATION PLAN_L-4.TIF DEVELOPMENT PACKAGE VIEW
011_LANDSCAPE CONSTRUCTION DETAILS_L-5.TIF DEVELOPMENT PACKAGE VIEW
012_SWPP NOTES_12 OF 15.TIF DEVELOPMENT PACKAGE VIEW
013_SWPP PLAN / DETAIL SHEET_ DEVELOPMENT PACKAGE VIEW
014_DRAINAGE SCHEME_ DEVELOPMENT PACKAGE VIEW
015_DRAINAGE SCHEME_ DEVELOPMENT PACKAGE VIEW
RAY WATER CAPACITY LETTER FOR DESERT POINT 2.PDF DOCUMENTS VIEW
1_TP DESERT POINT 2_ADDRESSING.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
FLD NEIGHBORHOOD -APPLICANT.PDF DOCUMENTS VIEW
FLD NEIGHBORHOOD MEETING MINUTES.PDF DOCUMENTS VIEW
SIGN IN SHEET.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
1_TP APPLICATION.PDF DOCUMENTS VIEW
1- DEVELOPMENT PACKAGE CHECKLIST.PDF DOCUMENTS VIEW
1- DEVELOPMENT PACKAGE CHECKLIST.PDF DOCUMENTS VIEW
FLD E-MAIL.PDF DOCUMENTS VIEW
2_TP APPLICATION.PDF DOCUMENTS VIEW
3-DESERT POINT REZONING CONDITIONS.PDF DOCUMENTS VIEW
3-DESERT POINT REZONING CONDITIONS.PDF DOCUMENTS VIEW
3-COMMENT RESPONSE LETTER DOCUMENTS VIEW
2-FLD PRIVACY MITIGATION PLAN.PDF DOCUMENTS VIEW
2- DESERT POINT 2 SOIL REPORT .PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW
ARCHITECTURAL VARIATION PLAN.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW