Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
04/10/2017
Applicant:
David Gary Gerovac
Description:
SITE/GRADING

Permit Reviews

Permit Number - DP17-0084
Permit Status: Complete
Permit Description: SITE/GRADING
Start Date Submittal Complete Date Status  
04/10/2017 SITE and/or GRADING 04/18/2017 COMPLETED Review Details
04/18/2017 RESUB - SITE and/or GRADING 05/12/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0084
Permit Description: SITE/GRADING
Total Completed Inspections - 9
Date Description Inspector Results Comments
06/19/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 06/19/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
06/19/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 06/19/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
08/01/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 08/01/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/01/2018 COT - ENGR - Signage Final Passed {Activity date: 08/01/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/10/2018 SITE - Stormwater Follow-up Passed {Activity date: 09/10/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/09/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME} ; {Activity date: 03/01/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - CONTROLS HAVE BEEN INSTALLED AT STOCK PILE.} ; {Activity date: 02/27/2018; Status: Correction Required; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH BOB MALLORY ON SITE TO REMOVE STOCK PILE AND TO PROVIDE CONTROL UNTIL THEY RE MOVE STOCK PILE ON LOT WEST OF SITE.} ; {Activity date: 02/23/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT STOCK PILE ON LOT TO THE WEST OF JOB SITE NEEDS TO BE REMOVED AND PROVIDE SWPPP CONTROLS UNTILL ITS REMOVED. AND THEN PROVIDE STABILIZATION FOR THE DISTURBED AREAS.} ; {Activity date: 02/12/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET ON SITE WITH GC NO CONCERNS AT THIS TIME.} ; {Activity date: 02/01/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/29/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/25/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 01/09/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT REPAIRS TO SWPPP CONTROLS.} ; {Activity date: 01/05/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 12/26/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NEED TO ADD TRACK OUT ROCK AND MAKE REPAIRS TO SWPPP CONTROLS.} ; {Activity date: 12/18/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 11/30/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ON SITE NO CONCERNS AT THIS TIME.} ; {Activity date: 11/13/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NEW CONTROLS INSTALLED.} ; {Activity date: 11/08/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GC ABOUT ADDING AND REPAIRING SWPPP CONTROLS.} ; {Activity date: 10/06/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - 1) PLACE ADDITIONAL BMP'S AROUND THE STOCKPILE THAT IS LOCATED WEST OF THIS SITE.
2) CLEANUP ALL TRACKED OUT MATERIAL AS NEEDED ON THE PRIVATE PROPERTY WEST OF THIS SITE.} ; {Activity date: 09/19/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ON SITE ABOUT REPAIRS TO SWPPP CONTROLS.} ; {Activity date: 09/01/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GC HAD REPAIRED CONTROLS AND PROVIDED WASH OUT.} ; {Activity date: 08/30/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET ON SITE WITH GC ABOUT REPAIR OF SWPPP CONTOLS.} ; {Activity date: 08/15/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT.}
09/10/2018 ENGR Grading Final Passed {Activity date: 09/10/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/14/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/14/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } ; {Activity date: 09/10/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE SITE INSPECTIONS FOR THIS SITE}
09/14/2018 ENGR Engineering Final Passed {Activity date: 09/14/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - Told Greg to provide termination of SWIP{P tp Permit counter for Cof O} ; {Activity date: 09/10/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - 1) COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS.
2) MAKE THE NECESSARY CHANGES TO THE NORTHERN MOST HANDICAP PARKING SPACE AND ACCESS AISLE PRIOR TO SCHEDULING THIS REINSPECTION.}
09/14/2018 SITE - Stormwater Final Inspection Passed {Activity date: 09/14/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } ; {Activity date: 09/10/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PROVIDE THE CITY WITH THE STAMPED APPROVED REVISED DRAWINGS FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE ALONG WITH THE NOTICE OF TERMINATION FROM ADEQ.}

Documents

File Name Document Type  
None DOCUMENTS VIEW
None DEVELOPMENT PACKAGE VIEW
001_COVER SHEET_1 OF 6.TIF DEVELOPMENT PACKAGE VIEW
002_NOTES_2 OF 6.TIF DEVELOPMENT PACKAGE VIEW
003_SITE_3 OF 6.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / DRAINAGE_4 OF 6.TIF DEVELOPMENT PACKAGE VIEW
005_UTILITIES / EASEMENTS_5 OF 6.TIF DEVELOPMENT PACKAGE VIEW
006_DEMO_6 OF 6.TIF DEVELOPMENT PACKAGE VIEW