Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/10/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
09/10/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
09/10/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
07/19/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - OK TO POUR THE SIGN FOUDATIONS |
12/22/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - REBAR FOR MAT IN TRASH ENCLOSURE OK. |
12/04/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - FOOTER FOR TRASH ENCLOSURE OK ONLY. |
10/17/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - BASE FOR NORTH CATCH BASIN AT EAST END. |
07/06/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - CATCH BASIN AT EAST AND WEST END OF SOUTH BASIN REBAR FOR FLOOR INSTALLED. |
09/10/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
08/10/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - LOOKEDOVER THE PROPOSED PLANS FOR THE CHANGES TO THE PARKING CALCULATIONS |
10/06/2017 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - THE CREW CONTINUES TO WORK ON THE INSTALLATION OF THE BELOW GRADE RETENTION/DETENTION BASIN LOCATED AT THE NORTHWEST CORNER OF THE SITE. THE INSTALLATION OF THE MATERIAL SHOULD BE COMPLETED BY THE FIRST OF NEXT WEEK AND THE PACKFILL OF THE BASIN AREA SHOULD BEGIN THE WEEK FOLLOWING. |
07/26/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH GC ABOUT PROVIDEING ADA PARKING BEFORE START OF SCHOOL. |
07/14/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT INSTALLING NEW ADA PARKING AREA BEFORE SCHOOL STARTS OR NEEDS TO PROVIDE TEMP ADA PARKING AP BY COT. |
07/13/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - COMPLETE THE SITE WORK AS SHOWN ON THE APPROVED PLANS |