Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
04/06/2017
Applicant:
Description:
SITE/GRADING - CHICK-FIL-AOriginal approval 08/14/2017 (8 pages)

Permit Reviews

Permit Number - DP17-0081
Permit Status: Complete
Permit Description: SITE/GRADING - CHICK-FIL-AOriginal approval 08/14/2017 (8 pages)
Start Date Submittal Complete Date Status  
04/06/2017 DEV PKG - OK TO SUBMIT 04/06/2017 COMPLETED Review Details
04/06/2017 DEV PKG 06/21/2017 COMPLETED Review Details
06/21/2017 DEV PKG - RESUBMITTAL 08/11/2017 COMPLETED Review Details
08/11/2017 DEV PKG - RESUBMITTAL 11/27/2018 COMPLETED Review Details
11/27/2018 REVISION - GRADING 11/28/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0081
Permit Description: SITE/GRADING - CHICK-FIL-AOriginal approval 08/14/2017 (8 pages)
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/16/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/16/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/07/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 09/07/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by RCAMACH1 - THE CREW HAS INSTALLED THE TRACKOUT MATERIAL INTO THE SITE, BUT ADDITIONAL MATERIALS WILL BE REQUIRED TO PREVENT DIRT FROM BEING CARRIED FROM THE SITE TO THE ADJACENT PROPERTY OT THE WEST OF THIS SITE. ANOTHER INSPECTION WILL BE PERFORMED NEXT WEEK TO VERIFY IF ADDITIONAL MATERIALS ARE NEEDED FOR THIS SITE.}
01/23/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 01/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - }
01/23/2019 COT - ENGR - Signage Final Passed {Activity date: 01/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - }
01/25/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 01/25/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 01/23/2019; Status: Not ready for Inspection; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - installing}
01/25/2019 ENGR Engineering Final Passed {Activity date: 01/25/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - }
01/25/2019 SITE - Stormwater Follow-up Passed {Activity date: 01/25/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 01/18/2019; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } ; {Activity date: 12/11/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - No issues at this time, all track out has been clean.} ; {Activity date: 11/16/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Main entrance and site are in good condition, the only concern at this time is the Northwest temporary entrance. Correct the track out and replace the waddle.} ; {Activity date: 10/10/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Minor track out in parking lot, there is no track out on to Irvington at this time, controls in good condition.} ; {Activity date: 10/01/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS WITH THIS SITE AT THIS TIME, MINOR TRACKOUT NOTED IN THE PARKING LOT FOR THIS SITE, HAVE ADVISED THE CONTRACTOR
THAT WILL NEED TO CONTINUE TO MONITOR TOO ENSURE THAT NONE OF THIS DIRT IS BEING TRACKED OUT ONTO IRVINGTON ROAD.
} ; {Activity date: 09/07/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by RCAMACH1 - THE CREW HAS INSTALLED THE TRACKOUT MATERIAL INTO THE SITE, BUT ADDITIONAL MATERIALS WILL BE REQUIRED TO PREVENT DIRT FROM BEING CARRIED FROM THE SITE TO THE ADJACENT PROPERTY OT THE WEST OF THIS SITE.}
01/25/2019 ENGR Grading Final Passed {Activity date: 01/25/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - }
01/25/2019 SITE - Stormwater Final Inspection Passed {Activity date: 01/25/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 01/18/2019; Status: Not ready for Inspection; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - }

Documents

File Name Document Type  
001_TITLE SHEET_1 OF 8.TIF DEVELOPMENT PACKAGE VIEW
002_LOT PERMITTING STATUS TABLE_2 OF 8.TIF DEVELOPMENT PACKAGE VIEW
003_SITE PLAN_3 OF 8.TIF DEVELOPMENT PACKAGE VIEW
004_PRELIMINARY GRADING PLAN_4 OF 8.TIF DEVELOPMENT PACKAGE VIEW
005_CONCEPTUAL UTILITY PLAN_5 OF 8.TIF DEVELOPMENT PACKAGE VIEW
006_PLANTING PLAN_L-6.TIF DEVELOPMENT PACKAGE VIEW
007_IRRIGATION PLAN_L-7.TIF DEVELOPMENT PACKAGE VIEW
008_TRASH ENCLOSURE PLAN_8 OF 8.TIF DEVELOPMENT PACKAGE VIEW
TEP_FACILITY MAP.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW