Permit: DP17-0081

Parcel: 13705494B


Addresses:

1188 W IRVINGTON RD


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP17-0081

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
01/18/2019 ENGR Grading Final bbenedo1 Approved Entered by BBENEDO1 -
11/09/2018 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - installing curbs at this time
08/16/2018 ENGR Grading Final DROBERTS Not ready for Inspection Entered by DROBERT5 - NOT APPLICABLE AT THIS TIME
01/25/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
01/25/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
01/18/2019 ENGR Grading Final bbenedo1 Continued Entered by BBENEDO1 - stripping
12/11/2018 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - Contractor installing 3-foot Valley gutter as shown on plan. Call for inspection of Ballard mounting signs at accessible parking spaces when ready.
11/16/2018 ENGR Grading Final BBENEDON Partial Approval Entered by CBELL1 - contractor is installing concrete driveways
11/09/2018 ENGR Grading Final BBENEDON Partial Approval Entered by CBELL1 - menu board footings are okay.
10/01/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - CREWS ARE ALSO WORKING ON THE BUILDING CONSTRUCTION FOR THE CHICK-A-FILET.
09/07/2018 ENGR Grading Final DROBERTS Continued Entered by RCAMACH1 - THE CREW HAS INSTALLED THE TRACKOUT MATERIAL INTO THE SITE, BUT ADDITIONAL MATERIALS WILL BE REQUIRED TO PREVENT DIRT FROM BEING CARRIED FROM THE SITE TO THE ADJACENT PROPERTY OT THE WEST OF THIS SITE.
01/25/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
10/03/2018 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - SEE PREVIOUS COMMENTS DATED 10/1/2018
10/02/2018 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - SEE PREVIOUS COMMENTS FROM 10/1/2018
10/01/2018 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - LOOKED OVER THE SITE TO MAKE SURE THAT THE WORK HAS BEEN COMPLETED FOR THE TRASH ENCLOSURE AND THAT THEY ARE READY FOR THE PLACEMENT OF THE FINAL LIFT OF THE GROUT 4 TO 10 FEET. THEY HAVE PLACE ALL OF THE REBAR THAT IS REQUIRED AND ARE READY TO INSTALL THE GROUT, THIS WORK WILL BE COMPLETED BY THE END OF THE WEEK, WEATHER PERMITING.
09/28/2018 ENGR Grading Final BBENEDON Not ready for Inspection Entered by CMURPHY1 - recall for inspection after installing rebar and cleanouts thank you Brian
09/11/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CONTRACTOR HAS DUG THIS FOOTER TO THE WRONG DIMENSION NOT SHOWN ON THE APPROVED PLANS. THIS INSPECTION WILL BE RESCHEDULED AT A LATER DATE ONCE THE REWORK HAS BEEN COMPLETED.
09/07/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - NO ONE ON SITE AT THIS TIME