Permit Details

Status:
Complete
Type:
Development Package
Address:
2332 N ORACLE RD
Address NEW:
2332 N ORACLE RD
Apply Date:
03/06/2017
Applicant:
Description:
SITE/GRADING/SWPPP - CIRCLE K

Permit Reviews

Permit Number - DP17-0046
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - CIRCLE K
Start Date Submittal Complete Date Status  
03/06/2017 DEV PKG - OK TO SUBMIT 03/10/2017 COMPLETED Review Details
03/10/2017 SITE and/or GRADING 04/06/2017 COMPLETED Review Details
05/05/2017 RESUB - SITE and/or GRADING 06/02/2017 COMPLETED Review Details
06/02/2017 RESUB - SITE and/or GRADING 06/02/2017 COMPLETED Review Details
06/02/2017 RESUB - SITE and/or GRADING 09/27/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0046
Permit Description: SITE/GRADING/SWPPP - CIRCLE K
Total Completed Inspections - 9
Date Description Inspector Results Comments
10/25/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 10/25/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
10/25/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/25/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER SWPPP AND MAINTAIN THEM THROUGHOUT CONSTRUCTION
2) SWEEP UP TRACKED SOIL ROUTINELY
3) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE
4) CALL FOR UNDERGROUND
5) CALL FOR INSPECTION FOR ANY SITE CONCERNS AND/OR QUESTIONS}
03/15/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 03/15/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
03/15/2018 SITE - Stormwater Follow-up Passed {Activity date: 03/15/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/17/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/13/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED
2) A STABILIZED CONSTRUCTION ENTRANCE IS IN PLACE
3) ENSURE STORM WATER CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION.
4) CALL FOR INSPECTION FOR ANY SITE, KLANDSCAPING, OR STORM WATER CONCERNS/QUESTIONS}
03/15/2018 ENGR Grading Final Passed {Activity date: 03/15/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
03/15/2018 COT - ENGR - Signage Final Passed {Activity date: 03/15/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
08/01/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/01/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/16/2018; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS}
08/01/2018 ENGR Engineering Final Passed {Activity date: 08/01/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/16/2018; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS} ; {Activity date: 03/16/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PROGRESS INSPECTION. SITE NOT READY FOR FINAL APPROVAL} ; {Activity date: 03/15/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PRIOR TO FINAL APPROVAL PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD.
2) COMPLETE ALL SITE/GRADING/LANDSCAPING WORK PER THE APPROVED PLAN PRIOR TO FINAL APPROVAL}
08/01/2018 SITE - Stormwater Final Inspection Passed {Activity date: 08/01/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/16/2018; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS} ; {Activity date: 03/15/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL FILE A "NOT" WITH ADEQ}